www.belson.com
STEP #2:
FASTEN THE RACK TO THE BASE POSTS, BEING SURE TO LINE UP THE PRE-DRILLED HOLES TO THE
PILOT HOLES ON THE SIDE. USE ( 1 ) ONE 3/8” X4” HEX HEAD LAG BOLT AND ( 1 ) ONE 3/8” FLAT
WASHER PER HOLE TO SECURE.
3/8” FLAT WASHER
3/8” X 4” HEX
HEAD LAG BOLT