![Belshaw Brothers Heat & Ice H&I-2 Operator'S Manual And Technical Supplement Download Page 4](http://html1.mh-extra.com/html/belshaw-brothers/heat-and-ice-handi-2/heat-and-ice-handi-2_operators-manual-and-technical-supplement_2730394004.webp)
Belshaw Bros., Inc.
•
www.belshaw.com
•
Phone 206-322-5474
•
Fax 206-322-5425
H&I All Models OM
MN-1731EN
1
1 Operation
Figure 1. H&I-4
WARNING
Do not operate without proper water level.
This will prevent damage to the heater
element.
WARNING
Do not submerge the heating element or
control box with water.
Initial setup
1.
Remove H&I from box.
2.
Remove all packing materials.
3.
Wash H&I with warm water and a mild
detergent.
4.
Sanitize H&I
5.
Install one empty icing bowl.
6.
Fill kettle with hot water until the empty
icing bowl is floating ½ in. off the cover.
7.
Install the remaining bowls, lids and
thermometer to the kettle
8.
Plug in H&I
NOTE
Use hot water to fill the H&I, using cold
water can take up to 8 hours to heat up to
120°F.
9.
Turn on power switch.
10.
Set thermostat dial for desired icing
temperature.
NOTE
Final setting will vary depending on
desired icing temperature
NOTE
Do not turn H&I off overnight; H&I can
take up to 8 hours to reheat