![Bell System Practices Plant Series Adjustments Download Page 41](http://html.mh-extra.com/html/bell-system-practices/plant-series/plant-series_adjustments_2728553041.webp)
*
2.
36
Positioning Mechanism (Cont.)
POSITIONING LOCK LEVER
(1)
REQUIREMENT
LETTERS COMBINATION SET UP ON
CODE BARS. MAIN SIDE OPERATING
LEVERS AT UPPER END OF TRAVEL.
UPPER NOTCH OF VERTICAL POSI
TIONING LOCK LEVER FULLY ENGAGED
(MANUALLY IF NECESSARY) WITH
VERTICAL SLIDE PROJECTION.
ISS 7, SECTION 573-115-700
LEFT VERTICAL POSITIONING LOCK LEVER
LEFT VERTICA L SLIDE PROJECTION
UPPER SURFACE OF FOLLOWER ARM
REAR EXTENSION SHOULD BE
(2)
REQUIREMENT
MIN. IN CONTACT WITH
WITH PLAY TAKEN UP BY
MAX.
0.0041NCH
AWAY FROM
PULLING UPWARD WITH
INNER EXTENSION OF MAIN
8
OZS. TENSION ON TYPE
SIDE LEVER.
BOX CARRIAGE TRACK,
CLAMP SCREWS
INNER EXTENSION
VERTICAL SURFACES
MIN. IN CONTACT WITH
MA X.
0.012
INCH AWA Y
FROM EACH OTHER
TO ADJUST
POSITION RIGHT AND LEFT
VERTICAL POSITIONING
LOCK LEVERS WITH CLAMP
SCREWS LOOSENED.
�...
LEFT MAIN SIDE LEVeR
LEFT FOLLOWER ARM REAR EXTENSION
Page
41
Summary of Contents for Plant Series
Page 150: ... _ ...