Belkin RK2000 Instructions Download Page 2

RK2000 & RK2001 Instructions

Page 2

P35727

www.belkin.com
Belkin Corporation
501 West Walnut Street
Compton, CA 90220-5221, USA
Tel: 310-898-1100; Fax: 310-898-1111

© 2005 Belkin Corporation.  All rights reserved.
All trade names are registered trademarks of respective manufacturers listed.

Instructions (cont'd.)

2.

Install base angles to vertical upright channels.
a. Leaving vertical upright channels on edge, 

align holes in base with corresponding holes 
in each upright channel. Long leg of base 
should be facing you.

b. Install 4 hex head bolts and lock washers.

Finger tighten only.

c. Turn vertical upright assembly over 

(rotate 180 degrees) and repeat steps 
(a) and (b). Finger tighten only.

3.

Final tightening.
a. Stand rack upright.
b. Square unit using a level or carpenter square.
c. Tighten all bolts using socket or wrench.

4.

Secure rack to floor.
All racks should be bolted to the floor, or to an
equally stabilizing and secure surface, after 
desired location is determined.

5.

Equipment installation.
Your rack is now ready for installation of
equipment and panels.

Base Angle

Reviews: