Installation and operating manual
EN
56
DRYPOINT
®
M eco control
10. Decommissioning
Preparatory tasks
1.
1.
Depressurise the device and secure against pressure being applied again.
Depressurise the device and secure against pressure being applied again.
2.
2.
De-energise the device and secure it against being switched back on again.
De-energise the device and secure it against being switched back on again.
Remove the mains plug.
Remove the mains plug.
A “click” noise indicates the opening of the solenoid valve., which makes pressure drop in the device possible.
A “click” noise indicates the opening of the solenoid valve., which makes pressure drop in the device possible.
If only the mains voltage supply is interrupted, then the drying system will continue to operate in fail-safe mode. This means
that the entire purge air volume will be continuously consumed.