7.2 Installation work
The following requirements must be fulfilled to carry out installation work and preparatory work must be completed.
Preconditions
Tool
Material
Protective equipment
• Screwdriver - Philip's head
size 2.5
mm
• Additional installation and
operating instructions for
accessories used
• Sealing material such as PTFE strip
(EN 837-2)
•
Protective gloves (liquid-
resistant)
•
Safety glasses with side
protection (goggles)
•
Hearing protection
•
Class FFP 3 respirator
•
Safety shoes
Preparatory work
1.
Remove the dust cap from the following threads:
• Inlet and outlet on the housing head
• Condensate drain on the housing base
2.
Depressurize pipeline system or relevant pipe section.
3.
Observe the separator dimensions and ensure required space for installation.
See “6. Dimensions” on page 24.
4.
Pipelines must be able to support the additional weight of the separator. Additional attachments should be
mounted if necessary.
5.
Pipelines must be free from contamination and corrosion. Check pipe threads for damage. Defective pipes
must be replaced promptly.
6.
Pipelines must be free from mechanical tension and vibration. Compensate for vibrations by using vibration
dampers.
7.
Only use fittings suitable for this pressure and temperature range. The pipeline threads must match those on
the housing head.
8.
Design the condensate drain such that no compressed gas or condensate can escape into the area around the
separator. The drained condensate should be fed into a legally conforming preparation system (e.g. ÖWAMAT
®
or BEKOSPLIT
®
).
Installation and operation instructions
CLEARPOINT
®
Water separator
27 | 56
Summary of Contents for CLEARPOINT M010
Page 49: ...Installation and operation instructions CLEARPOINT Water separator 49 56 ...
Page 50: ...CLEARPOINT Water separator Installation and operation instructions 50 56 ...
Page 52: ...CLEARPOINT Water separator Installation and operation instructions 52 56 ...
Page 54: ...CLEARPOINT Water separator Installation and operation instructions 54 56 ...