
Connection work - single device
Illustration
Description / explanation
Connection cable
[X7]
8. Connect the connection cable
[X7]
according to the
terminal diagram “4.9 Terminal diagram power control
board” on Page 32.
B
4
X7
5
6
45
9. Screw the cable gland components
[4, 5, 6]
onto the
right cable gland
[B]
.
10. Fit the screw terminal
[45]
.
2
1
11. Set the top cover
[2]
in place and insert the screws
[1]
.
12. Tighten the screws
[1]
with a torque of
0.5 Nm +0.5 Nm (0.37 ft-lb +0.37 ft-lb).
BEKOMAT
®
13i / 13i CO / 13i CO PN50
Original installation and operation manual
42 | 76