10.2 Maintenance schedule
Maintenance
Interval
Wear parts exchange
Annually
Cleaning work
Annually
Visual inspection
Weekly
Leakage test
At the end of all assembly work and maintenance and
servicing work on the product
10.3 Maintenance work
For maintenance work to be carried out, the following prerequisites must be fulfilled and the preparatory tasks must
have been completed.
Prerequisites
Tools
Material
Protective equipment
• Screwdrivers:
Cross-head size 2.5 mm (0.09")
Flat-blade size 2.5 mm (0.09")
• e.g. adjustable spanner
• Cleaning brush made of wire or soft
plastic material with
Ø max. = 1.5 mm (0.05")
Ø max. = 2.5 mm (0.09")
• Sealants
• Lubricant for greasing the O-rings
• Mild detergent
• Cotton cloth or disposable tissue
Always to be worn:
Preparatory tasks
1.
Decommissioning and disassembly must have been completed.
10.3.1 Wear parts exchange
Illustration
Description / explanation
3
2. Loosen the 4 pan-head screws
[3]
.
Original installation and operation manual
BEKOMAT
®
12, 12 CO, 12 CO PN63
37 | 64