5/8
12
13
Off
Push cables
into cavity
behind panel
1
2
Click
4
8x
+1
-0
13 N.m.
Page 1: ...être remplacée par un employé de BEKA Schréder un agent ou une autre personne qualifiée L installation de ce produit doit être effectuée par un électricien qualifié A fonte de luz montada nesta luminária só pode ser substituída por um funcionário ou agente da BEKA Schréder ou por profissional qualificado autorizado para o efeito A instalação deste produto deve ser realizada por uma pessoa elétrica...
Page 2: ...2 8 2 3 4 5 6 Please note Gently insert the battery into the pole until it reaches the stopper 1 1 Lithium Ion 1 2 SuperCapacitor 2 1 1628 1635 4 6x 1 0 13 N m 4 6x 1 0 13 N m ...
Page 3: ...3 8 8 7 9 Red cables Red cables 13V 18V ...
Page 4: ...4 8 10 11 1 Lithium Ion 11 2 SuperCapacitor Plug Twist Plug Twist On On Item 5 6 N m 3 3x ...
Page 5: ...5 8 12 13 Off Push cables into cavity behind panel 1 2 Click 4 8x 1 0 13 N m ...
Page 6: ...attery voltage is above 11 3V Remove battery and charge using AC power or disconnect load for 2 days to allow batteries to charge up fully Battery reached end of life Depends on technology and environmental conditions Replace batteries with specified batteries Solar Panel has poor connection thus batteries are not being charged fully during day cycle Check terminals on charge controller that solar...
Page 7: ...unt 900 x 900 x 900 Class 10 Concrete 6m buried 900 Ø600 auger Soilcrete 1 10 6m buried 900 900 x 900 x 900 Soilcrete 1 10 8m buried 1200 Ø600 auger Soilcrete 1 10 8m buried 1200 1000 x 1000 x 1200 Soilcrete 1 10 Post top version 4 6m surface mount 700 x 700 x 466 Class 10 Concrete 4 6m buried 700 800 x 800 x 700 Soilcrete 1 10 4 6m buried 700 Ø600 auger Soilcrete 1 10 Pole Planting Specification ...
Page 8: ...ty Ltd 13 West View Road Olifantsfontein South Africa The information descriptions and illustrations herein are of only an indicative nature and subject to changes without notice SOLARPOLE_PT_IS_02_2022 www beka schreder co za ...