background image

Safety Precautions

Beijer Electronics, MAEN979B

7

1.3 During Installation

– The EPC is designed for stationary installation on a plane surface, where the 

following conditions are fulfilled:

• no high explosive risks
• no strong magnetic fields
• no  direct  sunlight
• no large, sudden temperature changes

– Install the EPC according to the accompanying installation instructions.

– Ground the EPC according to the accompanying installation instructions.

– Only qualified personnel may install the EPC.

– Separate the high voltage, signal and supply cables.

– Make sure that the voltage and polarity of the power source is correct before 

connecting the EPC to the power outlet.

– Peripheral equipment must be appropriate for the application and location.

– The controlling transformer has to comply with EN60742.

1.4 During Use

– Keep the EPC clean.

– Emergency stop and other safety functions may not be controlled from the 

EPC.

– Do not use too much force or sharp objects when touching the keys, touch 

screen etc.

Summary of Contents for EPC Box C2D Nautic

Page 1: ...EPC C2D Nautic Installation Manual MAEN979B 2010 08 English...

Page 2: ...ior to installing and using this equipment Only qualified personnel may install operate or repair this equipment Beijer Electronics AB including all its group companies is not responsible for modified...

Page 3: ...ance 11 5 Description of Parts 12 5 1 EPC C2D Nautic 12 5 2 Display 13 5 3 Communication Ports 14 5 4 Motherboard 15 5 5 Assembly 15 5 6 Power Supply 16 5 7 Earthing System 17 5 8 ATX Power Switch 17...

Page 4: ...1 EPC T150 150 C2D Nautic Front View 39 9 2 EPC T150 150 C2D Nautic Cut Out Drawing 40 9 3 EPC T150 150 C2D Nautic Outline Drawings 41 9 4 EPC T170 170 C2D Nautic Front View 42 9 5 EPC T170 170 C2D N...

Page 5: ...are in progress Please visit our web site for the latest information Model CE LR BV GL DNV ABS RS EN 60945 EPC T150 150 C2D Nautic X X X X X X X X EPC T170 170 C2D Nautic X X X X X X X X EPC T190 190...

Page 6: ...fluids metal filings or wiring debris to enter any openings in the EPC This may cause fire or electrical shock Only qualified personnel may operate the EPC Storing the EPC where the temperature is low...

Page 7: ...ng to the accompanying installation instructions Only qualified personnel may install the EPC Separate the high voltage signal and supply cables Make sure that the voltage and polarity of the power so...

Page 8: ...ical supply Clean the display and surrounding front cover with a soft cloth and mild de tergent Replacing the battery incorrectly may result in explosion Only use batteries recommended by the supplier...

Page 9: ...racteristics of each model for example EPC T170 C2D Nautic AC according to below There is a variant without display EPC C2D Box Nautic AC EPC T 170 C2D Nautic AC Computer series Optional touch screen...

Page 10: ...ately 3 0 m 24 V DC units are delivered without cable A variety of cables are available separately Installation manual This manual describes specific information about Beijer Electronics products only...

Page 11: ...ca tions The tests include a compass safety distance test Electrical devices such as the EPC C2D Nautic must be kept in a safe distance to a compass in operation according to the following table Compa...

Page 12: ...EN979B 5 Description of Parts 5 1 EPC C2D Nautic The EPC C2D Nautic consists of a Front unit and a PC unit These are installed in the same way independent of the display size The EPC Box C2D Nautic co...

Page 13: ...from the Windows Start menu Press the power button for longer than 4 seconds Forces the EPC to be turned off Press the power button again Turns the EPC on Press brightness down on the dimmer button s...

Page 14: ...rmal operation Red No input signal available or the screen is in energy saving mode The EPC is turned off or the screen is dimmed to 0 lowest value darkest possible Power ATX switch PS 2 mouse PS 2 ke...

Page 15: ...the supplied mount ing kit Note The quality of the memory module may influence the system stability When updating the memory module or adding a second one please only use memory modules ap proved by...

Page 16: ...4 V DC is carried out via a double pole connector Phoenix MST BT 2 5 2 The EPC C2D Nautic is certified for the connection to protective grounded power supply according to EN60950 The EPC Box C2D Nauti...

Page 17: ...ance with ATX specification via the ATX power switch the red button next to the power supply Should a correct automatic booting not function then this can have the follow ing reason In the BIOS settin...

Page 18: ...card is mounted in removed from a running EPC the EPC must be restarted in order to detect the system change Booting from a Compact Flash Card Follow the instructions below in order to boot the EPC f...

Page 19: ...2D Nautic is delivered with Windows XP operating system The operating system and other programs are installed on drive C Drive D contains all data required for a new installation drivers and opera tio...

Page 20: ...Current time Check that all IDE Devices HD CD and CF are correctly recognized Advanced BIOS Features CPU Features Execute Disable Bit Enabled Virtualization Technology Enabled Core Multi Processing En...

Page 21: ...Device Onboard LAN1 control Auto Onboard LAN2 control Auto Onboard LAN ROM control Disabled Integrated Peripherals Super IO Power ON Function Button only Onboard Serial Port1 3F8 IRQ4 Onboard Serial...

Page 22: ...Palette Snoop Disabled INT Pin 1 Assignment Auto INT Pin 2 Assignment Auto INT Pin 3 Assignment Auto INT Pin 4 Assignment Auto INT Pin 5 Assignment Auto INT Pin 6 Assignment Auto INT Pin 7 Assignment...

Page 23: ...specified order when re installing the system 1 Install the chipset driver 2 Install the graphic drivers 3 Install the touch screen drivers 4 Install the network drivers Note To avoid always having to...

Page 24: ...arting the sys tem terminate the automatic driver search for the graphic board driver and use the installation CD instead 5 After finishing the installation and re starting the EPC the following entri...

Page 25: ...onics MAEN979B 25 6 5 Touch Screen Installation 1 Start the touch screen installation from the driver CD follow the instruc tions on the screen and press Next Note Make sure to use a touch driver of v...

Page 26: ...Operation 26 Beijer Electronics MAEN979B 2 Accept the license agreement...

Page 27: ...Operation Beijer Electronics MAEN979B 27 3 Select Autodetect or manually select the technical connection data...

Page 28: ...4 Press Finish and follow the instructions for a re start 5 After a re start of the operating system you will find Hampshire Control Panel among the programs 6 Calibrate the touch screen with your fi...

Page 29: ...follow the instructions on the driver CD 2 Confirm each installation step and re start the EPC at the end of the instal lation 3 After the re start two new network icons appear in the right hand side...

Page 30: ...Operation 30 Beijer Electronics MAEN979B...

Page 31: ...e opened EPC may only be carried out by authorized per sonnel Only the expansion of hardware with memory and plug in cards is per missible within the defects liability period Attention Deadly Peril Ma...

Page 32: ...ronments Gently remove the fan cover remove the filter and insert a new filter in its place 7 3 PCI board Installation To install a PCI board the right hand side part of the rear enclosure has to be r...

Page 33: ...tronics MAEN979B 33 The picture of the opened EPC below shows the board holder 1 and the 2 PCI slots 2 2 Remove the cover of the desired slot to insert your PCI board by removing the screw and pulling...

Page 34: ...ve the board holder by unscrewing the two marked screws 4 Insert the PCI board if necessary bend the slot bracket a little bit Please ensure a correct fit at the rear edge 3 of the slot and make sure...

Page 35: ...Service Beijer Electronics MAEN979B 35 5 Mount your PCI board and make sure to properly tighten the screw 6 Re assemble the board holder and tighten the two screws properly...

Page 36: ...d narrow boards in the upper This way the support can be used in the correct way 7 4 Cable Fixing Points When connecting interface cables such as RS232 USB LAN or VGA the ca bles must be fixed at the...

Page 37: ...DIN EN 60529 IP20 according to DIN EN 60529 on all sides Weight 9 kg 10 kg 13 kg 5 5 kg Processor Intel Core 2 Duo Cache Bus Speed 4 MB 800 MHz System chipset Intel GME965 ICH8 M BIOS Award 4 MBit Fla...

Page 38: ...nsity typi cal 250 cd m2 Contrast ratio 450 1 1500 1 1000 1 Response time rise fall 6 ms 19 ms 15 ms 10 ms 13 ms 7 ms Display technology TN PVA SPVA Touch screen tech nology Resistive Touch screen res...

Page 39: ...Drawings Beijer Electronics MAEN979B 39 9 Drawings 9 1 EPC T150 150 C2D Nautic Front View 412 394 206 206 R10 6 x hole 6 5 mm 64 5 222 333 351...

Page 40: ...mm tolerance 1 mm Space for mounting screws on all sides 15 mm needed space 399 0 x 354 0 mm Front plate 412 0 x 351 0 mm tolerance 0 2 mm Mounting method 6 x M6x25 steel screws DIN 6912 Screws and o...

Page 41: ...Drawings Beijer Electronics MAEN979B 41 9 3 EPC T150 150 C2D Nautic Outline Drawings Bottom view Rear view Side view 387 5 375 5 205 7 80 3 36 5 24 5 R3 R10 333 238 2 112 8 67 5 18...

Page 42: ...Drawings 42 Beijer Electronics MAEN979B 9 4 EPC T170 170 C2D Nautic Front View 8 x bore holes 6 5 mm 430 414 115 200 115 200 R10 105 180 374 390...

Page 43: ...0 mm tolerance 1 mm Space for mounting screws on all sides 15 mm needed space 426 0 x 394 0 mm Front plate 430 0 x 390 0 mm tolerance 0 2 mm Mounting method 8 x M6x25 steel screws DIN 6912 Screws and...

Page 44: ...Drawings 44 Beijer Electronics MAEN979B 9 6 EPC T170 170 C2D Nautic Outline Drawings Bottom view Rear view Side view 45 5 89 3 18 412 384 5 214 7 R3 R10 15 109 5 154 8 280 2 361 5...

Page 45: ...Drawings Beijer Electronics MAEN979B 45 9 7 EPC T190 190 C2D Nautic Front View 8 x bore holes 6 5 mm 126 6 230 126 6 230 483 2 126 6 R10 444 426 104 4 104 6 235...

Page 46: ...6 0 mm tolerance 1 mm Space for mounting screws on all sides 15 mm needed space 468 0 x 446 0 mm Front plate 483 2 x 444 0 mm tolerance 0 2 mm Mounting method 8 x M6x25 screws DIN 6912 Screws and o ri...

Page 47: ...Drawings Beijer Electronics MAEN979B 47 9 9 EPC T190 190 C2D Nautic Outline Drawings Bottom view Rear view Side view 458 1 411 1 241 3 115 9 72 1 25 1 R3 12 R10 16 5 146 5 191 8 317 2 398 5...

Page 48: ...tom view Rear view Side view Mounting method 6 x M4x12 steel screws DIN 912 or 4 x M6x12 steel screws DIN 912 Screws are included 104 114 43 8 169 2 339 10 20 5 55 5 134 220 5 276 144 44 120 14 5 374...

Page 49: ...lauer hmi com China Beijer Electronics Co Ltd Room 201 Buildning B No 1618 Yishan Road Shanghai 201103 CHINA Tel 86 21 6145 0400 Fax 86 21 6145 0499 info beijerelectronics cn USA Beijer Electronics I...

Reviews: