
PN 623112BA
2-1
2
2
INSTALLATION
2.1
OVERVIEW
The information in this section includes:
r
r
r
r
r
r
2.2
DELIVERY INSPECTION
The instrument is tested before shipping. International symbols and special handling
instructions are printed on the shipping cartons to inform the carrier of the precautions and
care applicable to electronic instruments.
When you receive your instrument, carefully inspect all cartons. If you see signs of
mishandling or damage, file a claim with the carrier immediately. If separately insured, file the
claim with the insurance company.
2.3
SPECIAL REQUIREMENTS
Before your Beckman Coulter Representative arrives to install the instrument, you must
determine where you want the system placed and the overall layout. Consider the factors
described in the following paragraphs:
Space
and Accessibility
In addition to the space required for the FP 1000, also arrange for:
r
Comfortable working height
r
Space for computer(s) and monitor(s)
r
Space for IsoFlow and waste containers
r
Adequate space in front to open the instrument doors
r
Space for ventilation, and access for maintenance and service
CAUTION
Risk of instrument damage. Possible instrument damage could occur if you uncrate the
instrument, install it, or set it up. Keep the instrument in its packaging until your Beckman Coulter
Representative uncrates it for installation and setup.
Summary of Contents for FP 1000
Page 4: ...PN 623112BA iv REVISION STATUS ...
Page 12: ...PN 623112BA xii INTRODUCTION COMPUTER PROGRAM STATEMENT ...
Page 30: ...PN 623112BA 3 6 SPECIFICATIONS PERFORMANCE SPECIFICATIONS ...
Page 32: ...PN 623112BA A 2 LOG SHEETS ...
Page 34: ...PN 623112BA A 4 LOG SHEETS ...
Page 36: ...PN 623112BA A 6 LOG SHEETS ...
Page 38: ...PN 623112BA A 8 LOG SHEETS ...
Page 48: ...PN 623112BA INDEX 6 INDEX ...
Page 50: ......