
B20063AC
4-1
CHAPTER 4
Preparing Other Integrated Devices
Overview
This section details the necessary workspace and electrical supply and power quality required for a
Biomek NX
P
Laboratory Automation Workstation integrated with other devices.
Preparing the site for other devices includes:
•
determining adequate space is set aside for devices integrated to the Biomek NX
P
instrument
(see
Dimensions for Integrated Devices
).
•
electrical supply and power are adequate for operation (see
).
Dimensions for Integrated Devices
Use
to determine adequate space for the Cytomat device and any other
optional integrated devices.
Leave a minimum of 2 feet behind the Biomek NX
P
instrument for service access and 2 feet in front
for instrument access.
NOTE
A Biomek NX
P
instrument with integrated devices may be controlled through Biomek Software or as
a Biomek Assay Workstation controlled through SAMI Workstation EX software.
Figure 4.1
System Layout Dimension Changes
Summary of Contents for Biomek NXP
Page 4: ...B20063AC iv Revision History...
Page 10: ...B20063AC x Safety Notice Warnings and Cautions Found in this Manual...
Page 42: ...B20063AC 3 12 Preparing Cytomat Devices Unpacking Cytomat Devices...
Page 46: ...B20063AC 4 4 Preparing Other Integrated Devices Electrical Component Requirements...
Page 51: ......