PN B10093AE
3-8
Troubleshooting
Accessing the Rotor in Case of Power Failure
9
Pull the interlock level out and left, and while holding it out, step on the foot pedal.
10
Remove your sample.
DANGER
Never try to slow or stop the rotor by hand.
To replace the panel on the centrifuge,
1
Holding the panel at the top (with the instrument label facing out), insert the three grooved
brackets on the bottom inside of the door over the front panel retaining strip (see
a.
Push the top of the front panel into place.
Figure 3.4
Front Panel Retaining Strip
2
Hold the left top edge in place and insert the Allen wrench through the hole.
a.
Turn to the right (clockwise) until the latch engages.
3
Repeat step 2 on the right side
The second latch engages.
1.
Retaining Strip
1
Summary of Contents for Avanti J-26S XPI
Page 4: ...PN B10093AE iv Revision History ...
Page 12: ...xii Contents Avanti J Series Centrifuge Warranty Related Documents ...
Page 14: ...xiv Illustrations ...
Page 16: ...xvi Tables ...
Page 20: ...PN B10093AE xx Introduction Multi Compliance Label ...
Page 36: ...PN B10093AE 1 16 Description Available Rotors ...
Page 66: ...PN B10093AE 3 10 Troubleshooting JCF Z Rotor Identification ...
Page 82: ...PN B10093AE A 10 Preinstallation Requirements Using J2 Series Rotors in the Avanti J 26S XPI ...
Page 86: ...PN B10093AE Warranty 2 Beckman Coulter Inc Avanti J Series Centrifuge Warranty ...
Page 87: ......