For runs at temperatures other than ambient, precool or prewarm the rotor to the required temperature
before the run.
1
Press the
POWER
switch to on (
I
). Open the centrifuge door.
2
Install the rotor. Make sure that the rotor load is balanced and that the rotor is securely fastened
to the centrifuge drive hub. Close the centrifuge door.
3
Turn the Rotor knob until the installed rotor name appears in the
ROTOR ID
display.
4
Turn the
SPEED
knob until the required run speed (rpm) appears in the
SPEED
display. Or press
RPM/RCF
to select
RCF
mode and turn the
SPEED
knob until the required rcf appears in the
SPEED
display.
5
Turn the
TIME
knob until the required run length appears in the
TIME
display. Or press
TIME/HOLD
for continuous operation.
6
Turn the
TEMP
knob until the required temperature appears in the
TEMP°C
display.
7
Press
ACCEL
repeatedly to select
MAX
(maximum) or
SLOW
acceleration.
8
Press
DECEL
repeatedly to select
MAX
(maximum) or
SLOW
deceleration, or select
OFF
(no brake).
9
Check that all parameters are correct and that the door is closed. Press
START.
10
Wait for the set time to count down to zero, or end the run by pressing
STOP
.
11
When the run is complete, open the door and unload the rotor.
Summary of Contents for Avanti J-26 XP Series
Page 6: ...J326XP IM 5AB vi Safety Notice Chemical and Biological Safety ...
Page 12: ...xii Tables ...
Page 16: ...J326XP IM 5AB xvi Introduction Recycling Label ...
Page 40: ...J326XP IM 5AB 2 8 Description Controls and Indicators ...
Page 54: ...J326XP IM 5AB 3 14 Operation Unloading the Centrifuge ...
Page 74: ...J326XP IM 5AB Warranty 2 Beckman Coulter Inc Avanti J Series Centrifuge Warranty ...
Page 76: ... 2012 Beckman Coulter Inc All Rights Reserved www beckmancoulter com ...