Commissioning
Version: 4.3
───
105
AM8000 and AM8500
Commissioning example
The procedure for commissioning is described as an example. A
different method may be appropriate or necessary, depending on
the application of the components.
10.1
Before commissioning
Pay attention to the following points before commissioning:
• In the case of multi-axis systems, commission each drive unit
separately
• Read the operating instructions for the servo drive
• Check drive for damage
• Check installation and alignment
• Tighten screw connections correctly
• Installing mechanical, thermal and electrical protective devices
• Check the wiring, connection and proper earthing of the
drive and servo drive
For motors with holding brake [+]
• Check the function of the holding brake [+]
• In case of malfunction: Apply 24 V
DC
, the brake must release
• Check emergency stop functions
For motors with fan cover [+]
• Check connection and function
• Fan must rotate freely, pay attention to grinding noises
• Check the direction of rotation of the fan
10.2
During commissioning
Pay attention to the following points during commissioning:
• Make sure that all fittings were checked for function and adjust-
ment
• Observe information for environment and operation
• Check protective measures against moving and live parts
Configuration
Beckhoff recommends the use of servo drives and motors from
Beckhoff in combinations, and configuration in the Beckhoff Twin-
CAT DriveManager.
Carry out the instructions in the operating manual for servo drives:
• Build Project and Choose Target System
• Implement devices by scanning or manually
• Configure devices, determine and set motor type
• Create axis configuration
• Set scaling factor and speeds
• Check status and activate control system