background image

Summary of Contents for AFII100

Page 1: ...read and carefully follow all instructions provided in this manual regarding your responsi bilities in caring for your heating equipment Contact a professional qualified service agency for installati...

Page 2: ...Page2 RWB 6104 BAFII R01...

Page 3: ...l Line Installation 6 Fuel Line Valves and Filters 6 Prepare the Burner 7 General 7 Low Fire Rate Baffle if specified 7 Mount Burner on Appliance 7 Connect Fuel Lines 7 Wiring Connection Diagram 8 Sta...

Page 4: ...sional qualified service agency for the installation adjustment and service of your oil heating system This work requires technical training trade ex perience licensing or certification in some states...

Page 5: ...available when calling or writing You will find the serial number on the silver label located on the left rear of the burner Refer to Figure 1 inspect Prepare installation Site Clearances to Burner an...

Page 6: ...s per hour of the total input rating of all appliances within the enclosure The openings should have free access to the build ing interior which should have adequate infiltration from the outside Exha...

Page 7: ...f a 50 micron primary filter located near the fuel tank and a secondary filter rated for at least 10 microns located near the burner Also install a generous capacity filter rated for 50 microns or les...

Page 8: ...ance is full of vapor or when the combustion chamber is very hot Do not attempt to re establish flame with the burner running if the flame becomes extinguished during start up venting or adjustment Va...

Page 9: ...st be manually reset If the control locks out three times in a row the control enters restricted lockout 5 IGNITION CARRYOVER Once flame is estab lished the ignition remains on for 10 seconds to ensur...

Page 10: ...evel has changed recheck the smoke and CO2 levels and readjust the burner if necessary Once combustion is set tighten all fasteners on air dial rear access door and escutcheon plate Start and stop the...

Page 11: ...psig 1 18 gph For typical nozzle flow rates at various pressures see ac companying chart 1 Turn off power to burner before proceeding 2 Disconnect copper oil connector tube from noz zle line 3 Loosen...

Page 12: ...rifice gets dirt in it or is scratched the nozzle will not function properly To install a new nozzle place a 3 4 open end wrench on the nozzle adapter Insert the nozzle into the adapter and secure fin...

Page 13: ...1 50 8 1 30 1 50 HLX Air Dial Setting Firing Rate AFII 85 AFII 100 AFII 150 140 psig 0 40 0 65 3 0 60 0 75 4 3 0 70 0 85 5 4 0 75 1 00 5 2 0 95 1 20 3 1 15 1 35 4 1 25 1 50 5 Head AFII 85 AFII 100 AFI...

Page 14: ...Replacement Parts Diagram For best performance specify genuine _ __ replacement parts SK8265B Page 14 RWB 6104 BAFII R01...

Page 15: ...lot Head AF2 9 Slot Head Head insulator Kit FB0 3 4 6 only 2184404U 31658 Speci_ 51671U 51672U 51685 Item Kit No 12 51805U 13 51485 14 51584U 51476U 15 21444U 16 213 17 Speci_ 18 51481 19 20 21 22 23...

Page 16: ...L AUTHORITY Equipment which is detective in material or workmanship and within the warranty period may be returned for credit as follows Beckett Burners Beckett branded major components and non Becket...

Reviews: