background image

2015

NBC-F

iltration & V

entilation S

yst

ems

 Approved by the 

Civil Defense Command

and the 

Standards Institution

 of Israel

In accordance with Israel 

Standard 4570

Beth-El 

Industries

Rainbow 36 V
User’s Manual

Ventilation & Air Filtration System for a Residential Safe Room

Summary of Contents for Rainbow 36 V

Page 1: ...ystems Approved by the Civil Defense Command and the Standards Institution of Israel In accordance with Israel Standard 4570 Beth El Industries Rainbow 36 V User s Manual Ventilation Air Filtration Sy...

Page 2: ...ww beind co il 2 Table of Contents Page Safety Instructions 3 System Parts List 4 System s Principle of Operation 6 Using the System 8 Routine Storage 10 Troubleshooting 11 Contact Information back co...

Page 3: ...o not use the system for any purpose other than for ventilation and filtration of a residential safety room and protection from biological and chemical warfare substances while staying in the safety r...

Page 4: ...il 4 System Parts List System cover Air inlet valve Connecting hose Electric blower Manual blower NBC filter Installed on the air inlet valve Indicator vane Installed on the overpressure blast valve B...

Page 5: ...enings When the room is in a state of overpressure the indicator vane 2 spins around In this state it is possible to remain in the room without the personal NBC masks on condition that the room is not...

Page 6: ...plumbing air conditioning water and sewage in the event that they are available in the residential safety room are sealed adequately Step 1 Remove the system cover Grasp the two handles on the sides...

Page 7: ...wall outlet 1 Press the operating switch on the blower 2 Wait a few seconds for the blower to start working Attention The indicator vane on the air outlet valve will start to spin after a few seconds...

Page 8: ...e positions First Position Attaching the manual blower directly to the filter In a residential safety room in which there is an air inlet valve located at a height below 1 6 meters Remove the manual b...

Page 9: ...he flexible hose 2 to it Attach the bracket to the adapter on the wall by means of sliding the bottom of the tabs into the appropriate slots as much as possible 3 Be sure that the other end of the con...

Page 10: ...emergency situation the company should be summoned for a service check and maintenance of the filter If there was no NBC attack but the filter was attached to the wall nonetheless it is possible to de...

Page 11: ...e opening of the filter and blower The filter doesn t fit into its location in the inlet valve A Make sure that you are holding the filter in the proper direction with the blue arrow on the label of t...

Page 12: ...Telephone 04 629 9988 E mail Rainbow beind co il Beth El Zikhron Yaaqov Industries Ltd 1 Avshalom Road P O Box 166 ZikhronYaaqov 3095101 Israel Tel 972 4 629 9999 israel beind com www beind co il rain...

Reviews: