17
7668357 - v.09 - 15062020
9.2. Connect the climate appliance to the gateway (part F):
Cable requirements
Maximum length
20 m
80 m
120 m
Cross-sectional area
0.8 mm
2
1.0 mm
2
1.5 mm
2
10. Connect the climate appliance to the power supply.
11. Connect the power adapter (part H).
12. Insert the batteries (part E).
13. Awaken the thermostat.
14. Setup the RF and wi-fi connection:
14.1. Setup the RF communication between the gateway and the thermostat.
14.2. Setup the wi-fi communication between the gateway and the wi-fi router.
15. Position and mount the back plate (part C).
15.1. Determine the position of the back plate (part C).
15.2. Drill the 2 marked holes.
15.3. Fit the plugs (part B).
15.4. Secure with screws (part B).
16. Mount the thermostat on the back plate.
17.
17.1. Determine the position of the gateway.
17.2. Drill the 2 marked holes.
17.3. Fit the plugs (part B).
17.4. Secure with screws (part B).
18. Mount the cable strain relief clamps.
19. Mount the cover.
20. Secure with screw.
21. Test the RF and wi-fi connections.
22. If the wi-fi connection should not be sufficient, turn the antenna to a horizontal position.
3. Intended use
• The gateway is designed to operate as a communication interface between a climate appliance
Summary of Contents for 28220
Page 3: ...3 7668357 v 09 15062020 AD 2000028 01 1 AD 2000029 02 50 cm 2 ...
Page 4: ...7668357 v 09 15062020 4 AD 2000032 01 5 AD 2000033 02 6 AD 2000030 01 F 3 AD 2000031 01 4 ...
Page 5: ...5 7668357 v 09 15062020 AD 2000047 02 I 7 AD 2000048 02 8 AD 2000034 02 F G 1 2 F H 1 2 9 ...
Page 7: ...7 7668357 v 09 15062020 AD 2000039 02 1 2 14 AD 2000040 02 ø 6 mm B B C 15 AD 2000041 01 16 ...
Page 9: ...9 7668357 v 09 15062020 AD 2000049 01 21 AD 2000050 01 22 ...
Page 52: ......
Page 53: ......