
6 | BDIUSA.COM
CORRIDOR 8173
Slide
(E) Metal Leg
into
(F) Metal Rail
and attach
by using
(B1) Hex Wrench
and
8 (D) Screws
.
NOTE: You MUST align arrows on (F) Metal Rails with
arrows on (E) Metal Legs or proper orientation.
Removal of wheels (optional):
Detach
Wheel Assembly
from
(E) Metal Leg
by removing the
Leveler
and
Screw
.
Reinstall
Leveler
to
(E) Metal Leg
.
PART/DESCRIPTION
QTY
B1-HEX WRENCH
1
D-SCREW
8
D
E
E
STEP 1.
BUILD THE BASE
ASSEMBLY
F
E
D
D
D
E
E
D
F
F
For your convenience, wheel assembly is pre-installed. Wheels can be removed if desired.
E
F