
bdiusa.com
MARGO
5201
Shelf
3
Step 3 -
Making sure the levelers are facing down, place
the left and right shelf frames
at least 2' off the
wall (to allow space to tighten screws behind the frames) and exactly
30.5" (780mm)
apart from each other as
shown. Use the
cardboard template
provided.
Step 4 -
With help from another person carefully tilt the front edge of a
shelf C1
downward 45 degrees and
slide it into the lower square opening of the shelf frame as shown until it is centered. Align the notch with
the front vertical bars of the frames. Rotate the shelf down until it is flat.
Repeat this step for the 2 upper
shelves.
2 feet or more
30.5" (780mm)
2 Person Task
C1
A1
Left Shelf Frame
A2
Right Shelf Frame
Align notch with frame
Rotate shelf down
until flat