background image

                                                                                     

 

BDCOM S3756F                                         

Hardware Installation Manual 

 

 

Summary of Contents for S3756F

Page 1: ...BDCOM S3756F Hardware Installation Manual...

Page 2: ...Safety Principles for Live Working 6 2 2 4 Electrostatic Discharge Damage Prevention 7 2 3 Requirements for Common Locations 7 2 3 1 Environment 7 2 3 2 Location Configuration Prevention 7 2 3 3 Cabin...

Page 3: ...nnecting Gigabit SFP Ports 15 1 4 Checking after Installation 15 Chapter 4 Maintaining Switch 17 4 1 Opening the Machine Box 17 4 2 Closing Machine Box 18 Chapter 5 Hardware Fault Analysis 19 5 1 Faul...

Page 4: ...ibute Gigabit Ethernet TX port RJ45 port LINK ACT indicators Gigabit Ethernet SFP port SFP interface with LINK ACT indicators 10G Ethernet SFP ports SFP interface with LINK ACT indicators Console port...

Page 5: ...switch No Abbrev Name Description 1 TE1 TE8 10G Ethernet optical ports SFP interface with LINK ACT indicators 2 The grounding column The grounding column must be fine 3 AC power socket AC90 264V 1 2 B...

Page 6: ...tion 4 gigabit COMBO ports 44 gigabit Ethernet SFP ports 8 10G Ethernet SFP ports 1 Console port Dimensions mm W D H 442 50 350 44 Operating temperature humidity 10 50 10 85 non condensation Storage t...

Page 7: ...BDCOM S3756F Hardware Installation Manual 4 1 3 ROHS Description...

Page 8: ...line socket Note 1 When you plug or dial the power line keep the power line horizontal with the power socket 2 When the lifetime of our products ends handle them according to national laws and regulat...

Page 9: ...g on the machine box or working beside the power source When the power is on do not touch the power Correctly connect the device and the power socket Only professionals are allowed to operate and main...

Page 10: ...2 3 1 Environment The switch can be installed on the desk or the cabinet The location of the machine box cabinet planning and indoor cabling are very important for normal system s function Short dist...

Page 11: ...ode in the machine box which can be obtained through different location tests 2 3 4 Power Requirements Power Requirements Make sure that the power supply has nice grounding and the power at the input...

Page 12: ...BDCOM S3756F Hardware Installation Manual 9 Static armguard Bolt Ethernet cable Other Ethernet terminal devices Control terminal...

Page 13: ...ace the devices 3 1 Installation Flow of BDCOM S3756F 3 2 Installing the Machine Box of the Switch The installation of the machine box has two modes Installing the machine box on the desk Installing t...

Page 14: ...switch After the brackets are installed install the switch on the cabinet See Figure 3 2 Figure 3 2 Installing the switch on the cabinet 3 3 Connecting the Port 3 3 1 Connecting the Console Port The...

Page 15: ...used to connect the console port of BDCOM S3756F and the outside console terminal device One end of the cable is a mini USB plug and the other end is a 9 hole plug DB9 The Mini USB plug is put into th...

Page 16: ...tion data traffic control to none when you configure the switch with the super terminal Otherwise the single pass problem will arise on the super terminal 3 3 2 Connecting 10G Ethernet SFP Ports BDCOM...

Page 17: ...in the UTP port is the same as that in the console port See figure 3 7 Figure 3 7 RJ 45 connector on the console port Because the 4 10 100 1000Base T ports of BDCOM S3756F support the MDI MDIX self i...

Page 18: ...u can connect the SFP optical module to the SFP port and then you can connect other Ethernet terminal devices through the optical cable Figure 3 9 Connecting the gigabit SFP port and other Ethernet te...

Page 19: ...allation Manual 16 Check whether the connected power meets the power requirements of the switch Check whether the grounding line is correctly connected Check whether the switch is correctly connected...

Page 20: ...describes how to open the cover of the switch required tools and operation methods Caution When the power cable still connects the power source do not touch it When you open the cover the switch you...

Page 21: ...ng Machine Box The section mainly describes how to put the cover and close the machine box Do as follows Put them well according to their locations and joint them together along their sides See the fo...

Page 22: ...ing checkups to help remove the fault When the power on off is at the ON location check whether the fan works normally If the fan does not work well check the fan The working temperature of the switch...

Page 23: ...is on 2 SYS System indicator When the indicator is always on the system is being started up When the indicator flickers the system works well 3 LINKACT Upper indicator for each port When the indicato...

Page 24: ...f this manual In no event except for the company s breach of law shall the company be liable for incidental consequential indirect or special damages of any kind or for loss of profits or revenue or l...

Reviews: