Bdcom S2956 series Hardware Installation Manual Download Page 7

                                                                                                                                S2956 Hardware Installation Manual 

- 5 -

 

z

 

Pull out the AC power socket and close the direct-current power before 

operating on the chassis or working beside the power source. 

z

 

The final configuration of products must comply with relative national laws and 

regulations. 

2.2.3 Safety Principles for Live Working 

When you work under electricity, following the following principles: 

z

 

Put off ornaments, such as ring, necklace, watch and bracelet, before you 

operate under live working. When metal articles connect the power to the ground, 
short circuit happens and components may be damaged. 

z

 

Please cut off the direct-current connection when you operate the hull or work 

near the power source. 

z

 

When the power is on, do not touch the power. 

z

 

Correctly connect the device and the power socket. 

z

 

Only professionals are allowed to operate and maintain the device. 

z

 

Read the installation guide carefully before the system is powered on. 

Note: 

z

 

Check potential dangers, such as the humid floor, ungrounded extensible power 

line and tatty power line. 

z

 

Install the emergent on-off at the working room for turning off the power when 

trouble happens. 

z

 

Turn off the power on-off of the switch and plug off the power line before 

installing or uninstalling the chassis or working beside the power. 

z

 

 Do not work alone if potential dangers exist. 

z

 

 Cut off the power before checkout. 

z

 

 If trouble happens, take the following measures: 

         A. Cut off the system’s power. 

             B. Alarm. 

C. Take proper measures to help persons who are hit by the disaster. Artificial 

respiration is needed if necessary. 

D. Seek for medical help, or judge the loss and seek for available help. 

Summary of Contents for S2956 series

Page 1: ...S2956 Hardware Installation Manual...

Page 2: ...7 2 4 Installation Tools and Device 7 Chapter 3 Installing S2956 8 3 1 Installation Flow of S2956 8 3 2 Installing the Chassis of the Switch 8 3 2 1 Installing the Chassis on the Desk 9 3 2 2 Installi...

Page 3: ...e LINK ACT indicators Gigabit Ethernet port SFP port having LINK ACT indicators Console port An RJ45 port with a rate of 9600 bps Additionally S2956 has a grounding column a socket and a power on off...

Page 4: ...Parameters of S2956 Supported standard IEEE 802 1d Spanning Tree Protocol IEEE 802 1s multiple spanning trees IEEE 802 1p Class of Service IEEE 802 1q tagged VLAN IEEE 802 3x Flow control IEEE 802 3z...

Page 5: ...40 10 85 non condensing Storage temperature humidity 40 80 5 95 non condensing Power Source s Characteristics Input voltage AC100 240V Input frequency 47 63Hz Input current 1 5A Output voltage 12VDC O...

Page 6: ...ontal with the power socket 2 When the lifetime of our products ends handle them according to national laws and regulations or send these products to our company for collective processing 2 2 Safety A...

Page 7: ...ouch the power z Correctly connect the device and the power socket z Only professionals are allowed to operate and maintain the device z Read the installation guide carefully before the system is powe...

Page 8: ...ices bad ventilation and untouchable control plate will cause maintenance problems systematic faulty and breakdown For location planning and device locating refer to section 2 3 2 Location Configurati...

Page 9: ...if necessary At least a 240 V and 10A fuse or a breaker is provided in the phase line if you prepare the short circuit prevention measures for a building Caution If the power supply system does not ha...

Page 10: ...S2956 3 2 Installing the Chassis of the Switch The chassis of the router can be installed on the desk or can be fixed to other cabinets Your network installation requirements can be met if you conduct...

Page 11: ...ch shown in the previous figure does not represent real S2956 After the brackets are installed install the switch on the cabinet See Figure 3 2 Figure 3 2 Installing the switch on the cabinet 3 3 Conn...

Page 12: ...e Because the console port of S2956 bears no flow control you need to set Data flow control to none when using a superior terminal to manage S2956 configurations or the single pass problem will arise...

Page 13: ...ical fiber if you want to use the SFP port Note The switch shown in the previous figure does not represent real S2956 switch 3 3 3 Connecting Ethernet Electric Port The S2956 switch has 48 10 100 1000...

Page 14: ...ase TX port and other Ethernet terminals Note The switch shown in the previous figure does not represent real S2956 switch Table 3 2 Definition of the pins of the 1000M RJ45 port No Pin name Symbol 1...

Page 15: ...ation Before electrically starting up the switch perform the following checkups after the switch is installed z If the switch is installed on the cabinet check whether the installation point between t...

Page 16: ...to open the cover of the switch required tools and operation methods Caution When the power cable still connects the power source do not touch it When you open the cover the switch you may use the fo...

Page 17: ...sis is hard to install 4 2 Closing the Chassis The section mainly describes how to put the cover and close the chassis Do as follows 1 Put them well according to their locations and joint them togethe...

Page 18: ...too hot check whether the air outlet and air inlet are clean and then do relative operations in section 2 3 Requirements for Common Locations The working temperature of the switch is from 0 to 40 Cel...

Page 19: ...ange partial or all contents of this manual and must not broadcast it in any manner Trademark claims Trademarks product names service names and company names which are written in this manual but do no...

Reviews: