SQ258
Owner’s Manual
7
Assembly Instructions
Remove all contents from the carton packaging. Make sure all parts are present before attempting assembly.
Once the grill is fully assembled, go back and check to make certain all the bolts are secure. Tighten again using
the screwdriver provided if necessary.
Estimated Assembly Time: 5 minutes
Step 1
a) Put the cooking grid (B) on the support of the
body assembly (A).
Step 2
a) Insert the grease cup (C) into the two guides
underneath the grill and push forward until it is in
place.
Step 3
a) Screw the gas cylinder clockwise into the thread
underneath the regulator valve until it is in place.
b) Make certain the connection is secure and
conduct the leak test on page 9.