
Step 5
Align the holes on the top tank hook (12) with the
holes on the top right beam.
Screw a M6 bolt (A) into pre-drilled hole.
Tighten by hand until secure.
Align the holes on the bottom tank hook (13) with
the holes on the bottom right beam.
Screw a M6 bolt (A) into pre-drilled hole.
Tighten by hand until secure.
Go back and tighten all the bolts with the
screwdriver provided.
Step 6
Align the holes on the top right panel with the
holes on the control panel.
Screw a M6 bolt (A) into each pre-drilled hole.
Tighten all bolts by screwdriver provided.
GPF2414-NS
9
Owner’s Manual