
7>QUICKSHIFT
(FOR USE WITH Z-FI TC ONLY!)
1.
Measure and note your shift pedal height,
so that you may reposition the shift pedal
once complete.
2.
Remove the factory shift rod and begin to
install the Bazzaz shift switch using one of
the supplied allen stud bolts and tighten.
3.
Next begin to install the Bazzaz shift rod.
The shift rod may need to be cut to get
your original shift pedal height
4.
Ensure to retighten all lock nuts on the shift
linkage
6.2
1.
Locate the factory right coil connector.
2.
Separate the factory red/grey wire, and
use the supplied scotchlok to crimp onto
the red/grey wire.
3.
Connect the Bazzaz right coil connector.
1.
Connect the Bazzaz coil harness to the
Bazzaz control unit, and begin to route the
harness along the Bazzaz fuel harness
towards the front of the bike.
2.
Locate the factory left coil, and separate the
factory orange wire.
3.
Use the supplied scotchlok to crimp onto the
orange wire, and connect the Bazzaz left
coil connector.
FACTORY
BAZZAZ
6>CONNECT
(FOR USE WITH Z-FI TC ONLY!)
6.1
BAZZAZ
FACTORY
BAZZAZ
FACTORY