background image

MT6100BTA
MT6100BTAL

Installation Instructions

MT6100BTA & MT6100BTAL can be mounted to the
Power Rail PR3256 & PR3256K. Use the same mounting
procdure as mounting them to the tubbie stands.
                                  (see page 1)
CAUTION: The Power Rail master power switch should 
                    always be in the OFF position before adding 
                    or exchanging accessories.

MT6100BTA & MT6100BTAL can be mounted to the
marine tubbie quick disconnect clamps MT-CL2-B,
MT-CL2-SS, and MT-CL3-SS. Use the same mounting
procdure as mounting them to the tubbie stands.
                                  (see page 1)

Red +12v DC 

Black -12v DC 

Step 1. Decide which clamp is going to the used for the
              amplified tubbie clamp and which will be the passive 
              tubbie clamp.
Step 2. Follow the clamp mounting directions that where
              provided with the clamps.
Step 3. Run a positive 12v DC  wire to the red wire and a neg-
              ative 12v DC wire to the black wire on the amplifed 
              tubbie and passive tubbie mounting clamp PCB 
              pigtails.  
Step 4. Run a jumper wire between the 2 white wires on the 
              amplifed tubbie and passive tubbie mounting clamp 
              PCB pigtails.
Step 5. Run a jumper wire between the 2 grey wires on the 
              amplifed tubbie and passive tubbie mounting clamp 
              PCB pigtails.  
Step 6. Use the same mounting procdure as mounting tubbies
              to the tubbie stands.  (see page 1)  
 

Amplified tubbie
          mount

Passive tubbie
      mount

To be able to use the MT6100BTA & MT6100BTAL with
the bar mount clamps you will have to wire clamps in
this configuration.

Power Rail Mount 

(Not Included)

Roll Bar / Wake Tower Mount

(Not Included)

Reviews: