background image

//

//

1.

2.

4.

3.

MT6100BTA
MT6100BTAL

1. Active BT tubbie stand
2. Passive BT tubbie stand with 6 ft. cable
3. Passive BT tubbie 
4. Amplified BT tubbie
5. 6 ft. power extention cable

Unlatch nut (7) and clamp (8) 
locking tabs. Then unscrew 
wingnut (9). 

Line amplified tubbie (4) up 
with the PCB mount on the top 
of the tubbie stand (1). Then push
down  firmly until clamp snaps in place.

Clamp locking tab (8) 

*

MUST* 

be latched before tightening 
wingnut (9)

Tighten clamp wingnut (9).
Then close nut locking tab (7).
Then repeat steps to mount
passive tubbie (3) to passive
stand (2)

 8.

7.

9.

8.

7.

9.

5.

Installation Instructions

Optional power adapter
  for 110v AC to 12v DC

*Not Included*

Reviews: