background image

Ø65mm Eave Purlin 5m

(3 way)

70.760

Ø65mm Eave Purlin 5m 

(3 way)

70.760

www.baytex.co.nz

simplicity - performance - style

8/15

Baytex Manufacturing Co Ltd

10m Hip End Clipframe Marquee

Portal Layout

12 Jun 2014

70.110.520 10m CF HE Erecting Manual.vwx

End

 Fra

me

Mid

 Portal

End

 Fra

me

Layout Bar

Layout Bar

5m

5m

15m

10m

5m

Mid

 Portal

1.   Assemble Portals  on ground

in position ready for rotating up

Base Fitting setout 

triangle slides onto base 

fitting pin

Base fitting lynch pin to secure 

triangle inplace

Layout bar pin slides into 

triangle fitting tube

2.   Attach Layout Bar & triangles to first & second portals.

secure with lynch pin

1

2

3

Keep Layout Bars in place 

untill bay is complete

5m Layout

 Bar

3.   Rotate First End Up

4

5

4.   Join Eave Purlins to Corner Connector

- Use Button Locks

5.   Attach 25mm Brace Bars

- Use Lynch Pins

4

7/13

9m Clipframe Marquee

7/13

9m CLIPFRAME HIP END

Portal Layout

Summary of Contents for CLIPFRAME HIP END

Page 1: ...w Zealand 52 Newton Street PO Box 4370 Mount Maunganui New Zealand tel 64 7 579 0190 fax 64 7 579 0194 www baytex co nz Australia tel 02 4340 4144 mob 0400 312 314 9mCLIPFRAMEHIPEND Assembly Instructions ...

Page 2: ... End View 4971 CTRS 9942 CTRS 2480 Top of Eave 2436 4916 Top of Apex 10007 Outside Eaves Scale 1 85 003 3 Mid Portal 4087 Baytex Manufacturing Co Ltd Clipframe Marquee Hip End 9m x 15m x 2 1m Leg Plan Elevations Building Excellence in the Tent Environment simplicity performance style 1 7 8 Oct 2013 4477 CTRS 2180 2164 Top of Eave 4344 Top of Apex 2975 CTRS 14954 Outside Eaves 4477 CTRS Scale 1 80 ...

Page 3: ...ector 26º To use with Channel Tube Rafter and Ø65mm Leg 5 Tensioner Set Includes x1 16mm Reid Bar Nut x1 Tensioner Hook x1 Tensioner Hook Adjuster 6 10m Side Rafter Channel Tube 7 10m Hip Rafter AliRail 2 piece 8 10m End Rafter Ø65mm 9 Ø65 Ridge Purlin 5m 5m Bay 10 Ø50 Intermediate Purlin 5m 5m Bay 5350 4853 4920 7190 5330 Ø65mm Ø50mm Ø65mm 2 13 9mCLIPFRAMEHIPEND Parts Identification ...

Page 4: ...3 way barce collars 12 Base Rail 4 97m 13 Ø25 Brace Bar 14 10m Apex Brace Hip Brace 15 90º Ø65 Leg 2 4m 90º Brace Collar 16 180º Ø65 Leg 2 4m 180º Brace Collar 17 Ø65mm Base Foot To use with Ø65 Leg 18 Roof Brace Cable Set Includes x4 Ø5mm Cable x4 Turnbuckle x4 Shackle 5050 4903 666 2669 2345 2345 200 7380 Ø25mm Ø50mm Ø34mm Ø65mm Ø65mm Ø65mm Ø65mm 3 13 9m Clipframe Marquee 3 13 9mCLIPFRAMEHIPEND ...

Page 5: ...mit speed to 50 of above In poor soil use more stakes or longer stakes Over 50km h All Walling to be fitted and closed Over 80km h All Fabric to be Removed from Frame Frame may be left standing 350kg Ballast Minimum Staking for each Leg of typical 10m x 5m Bay Typical Stake Capacity 250kg in average soil conditions 1 stake 250kg Ballast 500 350kg Ballast 0 55m x 0 55m x 0 5m Concrete Block Tied to...

Page 6: ...Connector 70 842 Ø65 Tee Connector 70 843 Ø65 Eave Purlin 5m 3 way 70 760 Ø65 Eave Purlin 5m 3 way 70 760 Ø25 Brace Bar 70 742 Ø65mm Leg 2 4m 180º 70 783 Ø25 Brace Bar 70 742 2 Join Tee Connector to Eave Use Button Lock 1 Join Corner Connector to Eave Use Button Lock note centre collar faces in up 3 Join Legs to Corner Tee Connectors Use Button Lock note corner leg has 90º collar 4 Join Base Fitti...

Page 7: ...6 Brace Wires 70 510 023 if required 3 Join Rafters to Apex Use Button Lock note Mid Apex 1 Join Shoulder Connector to Rafter Use Button Lock 2 Join Leg to Shoulder Connector Use Button Lock note side leg has 180º collar 4 Join Base Fitting to Leg Use Button Lock note orientate pins to outside 6 Attach 2 Roof Brace Cables to Apex Pin if Portal is adjacent to a Braced Bay Note Only required on 10m ...

Page 8: ...rtals on ground in position ready for rotating up Base Fitting setout triangle slides onto base fitting pin Base fitting lynch pin to secure triangle inplace Layout bar pin slides into triangle fitting tube 2 Attach Layout Bar triangles to first second portals secure with lynch pin 1 2 3 Keep Layout Bars in place untill bay is complete 5m Layout Bar 3 Rotate First End Up 4 5 4 Join Eave Purlins to...

Page 9: ... Rafter onto Mid Portal Apex note curved hook Keep Layout Bars in place untill bay is complete 9 Rotate Hip Rafter up to End Frame Corner Connector Use Clipset 5 Hip Rafter 70 510 012 Hip Rafter 70 510 012 End Rafter 70 510 019 Hip Brace 70 510 016 Hip Brace 70 510 016 10 Attach Hip Braces Use Linch Pins 6 7 8 9 2 3 4 1 Rotate End Frame to Vertical Support Eave near Second Portal 3 Join Mid Portal...

Page 10: ...recting Manual vwx 1 Move Layout Bars to Next Bay keep in place until bay complete 2 Attach Eave Purlins Brace Bars Keep Layout Bars in place untill bay is complete Layout Bar Layout Bar 3 Rotate Next Portal up 1 2 3 4 5 4 Join Mid Portal to Eaves Use button Lock 5 Attach Brace Bar Use Lynch Pin 9 13 9m Clipframe Marquee 9 13 9mCLIPFRAMEHIPEND Continued Frame Assembly ...

Page 11: ...quare to purlin twist Purlin Fork to reduce sliding 1 3 Hook Ridge Purlin into Second Mid Portal Apex Ensure Engaged 4 Install Intermediate Purlins same process as Ridge Purlin Keep Layout Bars in place untill bay is complete 5 Attach Roof Brace Wires to Shoulders Use Shackle Do not fully tension turnbuckle until roof fabric is in place 2 3 1 Ø50mm Intermediate Purlin 5m 70 792 4 5 2 5 Brace Wires...

Page 12: ...y placements 4 1 Keep Layout Bars in place untill bay is complete Layout Bar Layout Bar 3 Last Bay is a Hip End Bay Assemble End Frame on Ground Attach Layout bars Attach Eave Purlins Brace Bars Rotate End Frame Up join to Eave Purlins Brace Bars Attach End Rafter Attach Hip Rafters briefly disengage corner eave if difficult Attach Hip Braces 3 Stake or Ballast Frame before Fabric Installed 4 Peg ...

Page 13: ...ing fabric 3 Fit Keder Feeder in Rafter end optional part secure with hook around leg 5 Pull Panel Evenly 4 Engage Keder in Rafter Extrusion feed through Keder Feeder 1 5 3 6 Tension Mid Panels 6a Mk2 Use Packlocks 6b Mk3 Tension System Stake or Ballast Frame before Fabric Installed Optional Keder Feeder 7 Hip End Roof Fabric Installed the same as Mid Ease Fabric over frame if snagged 7 4 12 13 9m...

Page 14: ...lation 12 Jun 2014 70 110 520 10m CF HE Erecting Manual vwx 2 Lace Walls together behind leg 3 Insert Base Rail in Pocket 4 Attach Base Rail to Base Foot Use Lynch Pin 1 Hook Wall onto Wall cord of Roof Pockets to inside 2 1 4 3 Inside View Outside View 13 13 9m Clipframe Marquee 13 13 9mCLIPFRAMEHIPEND Wall Fabric Installation ...

Reviews: