Ø65mm Eave Purlin 5m
(3 way)
70.760
Ø65mm Eave Purlin 5m
(3 way)
70.760
www.baytex.co.nz
simplicity - performance - style
8/15
Baytex Manufacturing Co Ltd
10m Hip End Clipframe Marquee
Portal Layout
12 Jun 2014
70.110.520 10m CF HE Erecting Manual.vwx
End
Fra
me
Mid
Portal
End
Fra
me
Layout Bar
Layout Bar
5m
5m
15m
10m
5m
Mid
Portal
1. Assemble Portals on ground
in position ready for rotating up
Base Fitting setout
triangle slides onto base
fitting pin
Base fitting lynch pin to secure
triangle inplace
Layout bar pin slides into
triangle fitting tube
2. Attach Layout Bar & triangles to first & second portals.
secure with lynch pin
1
2
3
Keep Layout Bars in place
untill bay is complete
5m Layout
Bar
3. Rotate First End Up
4
5
4. Join Eave Purlins to Corner Connector
- Use Button Locks
5. Attach 25mm Brace Bars
- Use Lynch Pins
4
7/13
9m Clipframe Marquee
7/13
9m CLIPFRAME HIP END
Portal Layout