background image

Attach the Push Pole and check that the Retaining Clip 

and Cord are secure.

Lift the 

fi

rst Portal with everyone starting at the middle.  

As the Portal is raised the crew should move outwards in 

the direction of the arrows.

Hold the Portal securely in the not quite vertical position.

Secure both Portal Brace Stays to the adjacent Base Plates.

Engage the Ridge Purlin hook end 

fi

rst.

Raise the second Portal and rest on the Push Pole.

Use the Purlin Fork to engage the Ridge Purlin into the 

second Portal.

Engage the roof and wall Brace Cables underneath the 

Purlins.

IMPORTANT: All Brace Cables must be properly 

fi

tted

into a single bay as shown.

Lightly tighten all the Brace Cables.

RAISE PORTALS

FIT BACE CABLES

11

12

13

14

15

16

17

18

19

20

Reviews: