www.baytex.co.nz
10/18
SIMPLICITY - PERFORMANCE - STYLE
10m Square Frame Marquee
Mid Frame Portal Assembly
21 Dec 2021
80.110.500 10m SQ Assembly Manual.vwx
Assemble Mid Portal
4
5
10m SQ Rafter
80.510.01
SQ Apex Fitting
80.700
10m SQ Rafter
80.510.01
SQ 2.6m Leg
80.703
SQ Shoulder Fitting
80.701
SQ Base Fitting
80.716
SQ Base Fitting
80.716
SQ 2.6m Leg
80.703
SQ Shoulder Fitting
80.701
SQ Apex/Knee Brace
80.705
SQ Apex/Knee Brace
80.705
SQ Apex/Knee Brace
80.705
Roof Brace Cables
80.510.10
1
1
2
3
7
3. Join Legs to Shoulder Fittings
- Use Button Lock
1. Join Rafters to Apex Fitting
- Use Button Lock
2. Join Shoulder Fittings to Rafters
- Use Button Lock
4. Join Legs to Base Fitting
- Use Base Pin
note: orientate pins to outside
5. Join Apex Brace to Rafters
- Use Lynch Pin
6. Join Knee Braces to Leg and Rafter
- Use Lynch Pin
7. Attach 2 Roof Brace Cables to Apex Inside
6