background image

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

It is recommended to place a sheet / carton below the parts to avoid scratches and 
peeling of paint.  

 

Profile should be fixed in front of the second set of holes from the edge. 

Step 3 

   

Central channel should remain open. Please place the panel aside the central channel of the 
arched profile, as illustrated in the top circle.  

Step 5 

Please connect two parts when one person lifts the construction at an angle as illustrated in 
drawing 5A. 

Step 9 

Do not tighten the screws fully, until both sides panels are in place.  

Step 10 

During Assembly

 

Step 11 

Profile stretching occurs only when all screws are closed fully, at the same time; on both 
sides.  

Step 12 

Repeat and follow the same action for all profiles left as explained in stages 10 – 11. 

Step 15 

Optional – if you wish to use the gutter heads for water drainage, pop the inner plastic by 
making a small hole with a screwdriver and then pop it with your finger. 

Step 15 

Level the profile legs and then adapt screws and plugs to the ground type. 

General: 
Tighten all screws at the end of assembly. 

Reviews: