It is recommended to place a sheet / carton below the parts to avoid scratches and
peeling of paint.
Profile should be fixed in front of the second set of holes from the edge.
Step 3
Central channel should remain open. Please place the panel aside the central channel of the
arched profile, as illustrated in the top circle.
Step 5
Please connect two parts when one person lifts the construction at an angle as illustrated in
drawing 5A.
Step 9
Do not tighten the screws fully, until both sides panels are in place.
Step 10
During Assembly
Step 11
Profile stretching occurs only when all screws are closed fully, at the same time; on both
sides.
Step 12
Repeat and follow the same action for all profiles left as explained in stages 10 – 11.
Step 15
Optional – if you wish to use the gutter heads for water drainage, pop the inner plastic by
making a small hole with a screwdriver and then pop it with your finger.
Step 15
Level the profile legs and then adapt screws and plugs to the ground type.
General:
Tighten all screws at the end of assembly.
Summary of Contents for Vitoria 5000
Page 4: ......
Page 5: ...Contents ...
Page 6: ......
Page 7: ......
Page 8: ......
Page 9: ......
Page 10: ......
Page 11: ......
Page 12: ......
Page 13: ......
Page 14: ......
Page 15: ......
Page 16: ......
Page 17: ......
Page 18: ......
Page 19: ......
Page 20: ......
Page 21: ......
Page 22: ......