9.0
Commissioning the Boiler
25
9.3
Completion
1. Flush the system again and treat it in
accordance with BS7593 and the flushing agent
and inhibitor manufacturer’s instructions.
2. Set the adjustable pointer on the pressure
gauge to 1 bar (Fig. 42).
3. Fill in the required details on the warning label
fixed to the rear of the outercase front panel.
4. Carefully read and complete all sections of the
“Benchmark” Installation, Commissioning and
Service Record Log Book that are relevant to the
appliance and installation. The details of the Log
Book will be required in the event of any warranty
work. The Log Book must be handed to the user
for safe keeping and each subsequent regular
service visit recorded.
5. Instruct the user in the operation of the boiler
controls. Hand over the User’s Operating,
Installation and Servicing Instructions and the Log
Book, giving advice on the necessity of regular
servicing.
6. Show the user the position of the tundish and
discharge pipe.
7. Refit the outercase top and front panels and
close the facia cover panel.