37
7216549.01 - en
INSTALLATION AND OPERATING MANUAL
After having completed the masonry work, fix the LUNA SAT module appliance inside the template box and make the
hydraulic connections (see Figure 3).
Before fixing the module, drill holes in the rear wall for the Ø 10mm expansion grips (if the casing/template has already
been installed the holes in the casing/template as a guide). Then secure the module with the supplied screws.
Note
: The casing/template is supplied standard with a shut-off valve
5. MOUNTING THE APPLIANCE
Key
CENTRALISED PLANT CONNECTIONS
IP:
primary inlet from centralised plant G 3 ⁄ 4” M
UP:
primary outlet to centralised plant G 3 ⁄ 4” M
MR HEATING PLANT CONNECTIONS
MR:
Heating flow G 3 ⁄ 4 ” M
RR:
heating circuit return G 3 ⁄ 4 ” M
UCS DHW PLANT CONNECTIONS
UCS
:
G 3/4” M hot domestic water outlet
UFS:
G 3/4” M cold domestic water outlet
EFS:
G 3/4” M cold domestic water inlet
1409_2202.a
i
installation in
casing/template
installation in
wall cavity
Figure 3
TOP VIEW
BOTTOM
VIEW
CR_0663
150
22
55
4
22
PUNTI DI FISSAGGIO
PUNTI DI FISSAGGIO
IP
UP
MR
RR
UFS EFS
UCS
AE
60
0
85
65
153
65
382
73
105
72
65
138
92
55
40
,5
109,
5
65
85
127
62
62
62
127
62
62
54
34
36
0
12
0
28
,3
122
54
34
600
350
43
5
62,5
62,5
MR
RR
UFS
EFS
UCS
600
L
MIN.
60
0
HM
IN
IP
UP
25
550
25
153
65
382
73
105
72
65
138
147
12
0
36
0
12
0
82
,5
82
,5