3.0 Appliance Operation
3.1 Operating Mode (
1. With a demand for heating or hot water, the pump circulates water through the primary circuit. If the flow is 4.0 L/min or above the ignition sequence will start.
2. When the flow temperature reaches the set point temperature, a 5 minute delay occurs before the burner relights automatically (anticycling). The pump continues to run
during this period.
3. When the demand is satisfied the burner is extinguished and the pump continues to run for a period of 5 minute (Pump Overrun).
Summary of Contents for ECOGEN 24/1.0
Page 69: ...Fig 77 Fig 78 Fig 79 page 69 16 0 Schematic Wiring 16 1 Burner Control Units BCU Connections...
Page 70: ...page 70 16 2 Milligrid 24 way Connector...
Page 71: ...page 71 16 3 14 way Connector...
Page 72: ...page 72 16 4 Engine Circuit...
Page 73: ...page 73 16 5 Power Monitoring 24Vdc Power Supply...
Page 74: ...page 74 16 6 External Connections External Wiring...
Page 85: ...page 87...
Page 86: ...page 88...
Page 87: ...page 89 Section P...
Page 88: ...page 90...
Page 89: ...page 91 Section Q Engine developing less than 950W after 15 minutes running at maximum rate...
Page 91: ...page 93 page 94 page 95 page 96 MICRO CHP SYSTEM COMMISSIONING CHECKLIST...
Page 92: ...page 97...