4. Examine and clean or replace the electrodes as necessary. The spark gap should be 3.5 4.0 mm, adjust the earth pin if required (
).
5. Always use the new gaskets provide when replacing the electrodes.
6. Replace in the reverse order.
Supplementary Burner and Heat Exchanger, Igniter and Flame Sensing Electrodes (
1. Detach the supplementary Igniter plug.
2. Detach the flame sense lead from the wiring harness.
3. Remove the four M5 screws at the right of the supplementary air gas manifold.
4. Undo the six nuts around the burner door perimeter noting the position of the earth lead.
5. Carefully with draw the burner door and manifold.
6. Clean any debris form the heat exchanger and check that the gaps between the tubes are clear.
7. Inspect the burner, insulation and the electrodes, clean or replace if necessary. Reset the electrode spark gap to between 3.5 4.0 mm by adjusting the earth pin if
required (
).
8. If it is necessary to replace electrodes always use the gaskets provided.
9. Reassemble in the reverse order remembering to attach the earth wire.
section of the
Benchmark Commissioning Checklist
at the rear of this publication and then hand it back to the user.
Fig. 53
Fig. 54
Fig. 55
page 60
14.0 Changing Components
IMPORTANT: When changing components ensure that both the gas and electrical supplies to the boiler are isolated before any work is started.
Summary of Contents for ECOGEN 24/1.0
Page 69: ...Fig 77 Fig 78 Fig 79 page 69 16 0 Schematic Wiring 16 1 Burner Control Units BCU Connections...
Page 70: ...page 70 16 2 Milligrid 24 way Connector...
Page 71: ...page 71 16 3 14 way Connector...
Page 72: ...page 72 16 4 Engine Circuit...
Page 73: ...page 73 16 5 Power Monitoring 24Vdc Power Supply...
Page 74: ...page 74 16 6 External Connections External Wiring...
Page 85: ...page 87...
Page 86: ...page 88...
Page 87: ...page 89 Section P...
Page 88: ...page 90...
Page 89: ...page 91 Section Q Engine developing less than 950W after 15 minutes running at maximum rate...
Page 91: ...page 93 page 94 page 95 page 96 MICRO CHP SYSTEM COMMISSIONING CHECKLIST...
Page 92: ...page 97...