Fig. 34 & Fig. 35
Fig. 36 & Fig. 37
Fig. 38 & Fig.39
8. Adjust the two telescopic sections to dimension 'Y' (
). Ensure that the rivets and holes in the Connection Assembly are aligned horizontally (
).
9. Using a 2mm bit, drill through the holes at the end of the Connection Assembly into the Terminal Assembly and secure them together using the screws supplied (
).
Seal the joint with the tape provided (
).
10. Remove the flue elbow and insert the flue through the hole in the wall. Refit the elbow to the boiler adaptor, ensuring that it is pushed fully in (
).
12. Ensure that the terminal is positioned with the slots to the bottom (
). Secure the flue to the elbow with the self drilling screws supplied (
).
IMPORTANT: It is essential that the flue terminal is fitted as shown to ensure correct boiler operation and prevent water entering the flue.
13. If necessary make good between the wall and air duct outside the building.
14. Fit the flue trim if required, and if necessary fit a terminal guard (see
&
).
Summary of Contents for ECOGEN 24/1.0
Page 69: ...Fig 77 Fig 78 Fig 79 page 69 16 0 Schematic Wiring 16 1 Burner Control Units BCU Connections...
Page 70: ...page 70 16 2 Milligrid 24 way Connector...
Page 71: ...page 71 16 3 14 way Connector...
Page 72: ...page 72 16 4 Engine Circuit...
Page 73: ...page 73 16 5 Power Monitoring 24Vdc Power Supply...
Page 74: ...page 74 16 6 External Connections External Wiring...
Page 85: ...page 87...
Page 86: ...page 88...
Page 87: ...page 89 Section P...
Page 88: ...page 90...
Page 89: ...page 91 Section Q Engine developing less than 950W after 15 minutes running at maximum rate...
Page 91: ...page 93 page 94 page 95 page 96 MICRO CHP SYSTEM COMMISSIONING CHECKLIST...
Page 92: ...page 97...