![Bavaria VISION 42 Sales Manual Download Page 42](http://html.mh-extra.com/html/bavaria/vision-42/vision-42_sales-manual_2711502042.webp)
SYSTEM.
Steering.
New VISION 46
42
Steering System:
Twin Wheel Single Rudder Open Wire Steering
Following the principle of one continuous 7x19 stainless steel
cable starting and ending at the radial quadrant on the rudder
stock.
Emergency tiller is applied through the lid covered access from
the cockpit floor.
Emergency tiller is stowed in the aft storage kept at the
bulkhead.
Rudder Bearings:
The bearings of the rudder stock are self aligning, roller bearing
type units.
Autopilot Drive (optional):
Rotary Sprocket Drive fitted to the port side idler bracket
running on a separate continuous chain loop to the port side
steerer.
(Emergency Tiller drawn right below)
Summary of Contents for VISION 42
Page 1: ...VISION 42 SALES MANUAL 06 11 2012 ...
Page 5: ...Test Yacht 2 1 Layout Boat 1 New VISION 42 5 ...
Page 6: ...LAYOUT 2 1 Standard New VISION 42 6 ...
Page 7: ...LAYOUT 2 2 Optional New VISION 42 7 ...
Page 14: ...OPTION Cockpit Cushions New VISION 42 14 ...
Page 23: ...CABIN CUSHIONS Forward cabin New VISION 42 23 Note Dimensions in mm 5mm ...
Page 24: ...CABIN CUSHIONS Salon Settee New VISION 42 24 Note Dimensions in mm 5mm ...
Page 25: ...CABIN CUSHIONS Nav Seats New VISION 42 25 Note Dimensions in mm 5mm ...
Page 26: ...CABIN CUSHIONS Aft Cabin New VISION 42 26 Note Dimensions in mm 5mm ...
Page 30: ...SYSTEM Floor Lights Indirect LEDs New VISION 42 30 ...
Page 31: ...SYSTEM Navigation Lights New VISION 42 31 ...
Page 32: ...SYSTEM Gas LPG System New VISION 42 32 ...
Page 33: ...SYSTEM Fire Extinghuishers New VISION 42 33 ...
Page 34: ...SYSTEM Emergency Plan New VISION 42 34 ...
Page 35: ...SYSTEM Freshwater New VISION 42 35 ...
Page 36: ...SYSTEM Hull Break Through New VISION 42 36 ...
Page 37: ...SYSTEM Electric 12V New VISION 42 37 ...
Page 38: ...SYSTEM Electric 220V New VISION 42 38 ...
Page 39: ...SYSTEM Deckequipment New VISION 42 39 ...
Page 40: ...SYSTEM Main Engine New VISION 42 40 ...
Page 41: ...SYSTEM Drains Grey Blackwater New VISION 42 41 ...
Page 44: ...OPTION Heating New VISION 42 44 1x WEBASTO AIR TOP EVO 5500 ...
Page 46: ...CERTIFICATION GZ Curves New VISION 42 46 ...
Page 47: ...PERFORMANCE VPPs Deep Keel 2 14m New VISION 42 47 ...
Page 48: ...PERFORMANCE VPPs Shallow Keel 1 63m New VISION 42 48 ...
Page 49: ...KEEL Mounting New VISION 42 49 ...
Page 50: ...Keel weight 3 450kg KEEL Deep Keel Standard New VISION 42 50 Keel weight 2 767kg ...
Page 51: ...KEEL Shoal Keel Optional New VISION 42 51 Keel weight 3 033kg ...
Page 53: ...DATA SAILPLAN New VISION 42 53 ...
Page 57: ...RIG Furlex Cut Sheet New VISION 42 57 ...
Page 58: ...RIG Preliminary Rig Datasheets New VISION 42 58 ...
Page 65: ...FUSION MM Basic Package New VISION 42 65 Layout shows Vision 46 identical to Vision 42 ...
Page 66: ...FUSION MM Remote Cabin New VISION 42 66 Layout shows Vision 46 identical to Vision 42 ...
Page 67: ...FUSION MM Remote Owner Cabin New VISION 42 67 Layout shows Vision 46 identical to Vision 42 ...
Page 72: ...OPTION Garmin Network Full Option New VISION 42 72 42 ...
Page 74: ...LINES Halyards Lines Cockpit Standard New VISION 42 74 ...
Page 85: ...VIELEN DANK FÜR IHRE AUFMERKSAMKEIT THANKS FOR YOUR ATTENTION ...