background image

Mini Metal Lathe – BMLAT-07 

 

E&OE 

© 2020 Baumr-AG 

21 

NOTE

: If a compound gear train is required, as shown in Fig, B ensure the spacer, which is keyed to the 

shaft carrying gear D, is located on the shaft. BEFORE the gear, in order to align gear D with gear C. 

4.  Proceed to move the shaft carrying B and C and the adjuster 'A' so that all gears mesh correctly, then tighten 

the adjuster securing nuts. This may take one or two attempts but make sure there is as little backlash as 

possible without being over-tight, (Turn the spindle by hand to test for backlash). 

Replace the cover and secure with the two hex socket head bolts. 

Maintenance 

For maximum performance, it is essential that the lathe be properly maintained. 

Before Use 

 

Always inspect before use. Any damage should be repaired, and maladjustments rectified. Damage to 

machined surfaces should be repaired with an oil stone. Test by hand to ensure smooth operation of all parts 

before use. 

 

Apply a few drops of oil to the oil ways at both lead screw bearings (at each end bracket) and add more once 

or twice during the day if used continuously. It will be necessary to remove the gear train cover in order to oil 

the left-hand bearing. 

 

Apply a few drops also to the compound slide oil way, located on the slides' top surface, between the two 

socket head screws. 

After Use 

 

Remove all chips and debris from the machine and thoroughly clean all surfaces. If coolant had been used, 

ensure it has completely drained from the tray. 

 

Components should be dry, and all machined surfaces should be lightly oiled. 

 

Always remove cutting tools and store them in a safe place. 

Motor Brushes 

The Motor brushes may be changed by unscrewing the caps, visible at the front and rear of the machine 

beneath the Headstock, as shown in Fig.11. 

 

BAUMR-AG   BAUMR-AG   BAUMR-AG   BAU

MR-AG   BAUMR-AG   BAUMR-AG   BAUMR-AG   BAUMR-AG   BAUMR-AG   BAUMR-AG   BAUMR-AG  

BAUMR-AG   BAUMR-AG   BAUMR-AG   BAU

MR-AG   BAUMR-AG   BAUMR-AG   BAUMR-AG   BAUMR-AG   BAUMR-AG   BAUMR-AG   BAUMR-AG  

BAUMR-AG   BAUMR-AG   BAUMR-AG   BAU

MR-AG   BAUMR-AG   BAUMR-AG   BAUMR-AG   BAUMR-AG   BAUMR-AG   BAUMR-AG   BAUMR-AG  

BAUMR-AG   BAUMR-AG   BAUMR-AG   BAU

MR-AG   BAUMR-AG   BAUMR-AG   BAUMR-AG   BAUMR-AG   BAUMR-AG   BAUMR-AG   BAUMR-AG  

BAUMR-AG   BAUMR-AG   BAUMR-AG   BAU

MR-AG   BAUMR-AG   BAUMR-AG   BAUMR-AG   BAUMR-AG   BAUMR-AG   BAUMR-AG   BAUMR-AG  

BAUMR-AG   BAUMR-AG   BAUMR-AG   BAU

MR-AG   BAUMR-AG   BAUMR-AG   BAUMR-AG   BAUMR-AG   BAUMR-AG   BAUMR-AG   BAUMR-AG  

BAUMR-AG   BAUMR-AG   BAUMR-AG   BAU

MR-AG   BAUMR-AG   BAUMR-AG   BAUMR-AG   BAUMR-AG   BAUMR-AG   BAUMR-AG   BAUMR-AG  

BAUMR-AG   BAUMR-AG   BAUMR-AG   BAU

MR-AG   BAUMR-AG   BAUMR-AG   BAUMR-AG   BAUMR-AG   BAUMR-AG   BAUMR-AG   BAUMR-AG  

BAUMR-AG   BAUMR-AG   BAUMR-AG   BAU

MR-AG   BAUMR-AG   BAUMR-AG   BAUMR-AG   BAUMR-AG   BAUMR-AG   BAUMR-AG   BAUMR-AG  

BAUMR-AG   BAUMR-AG   BAUMR-AG   BAU

MR-AG   BAUMR-AG   BAUMR-AG   BAUMR-AG   BAUMR-AG   BAUMR-AG   BAUMR-AG   BAUMR-AG  

BAUMR-AG   BAUMR-AG   BAUMR-AG   BAU

MR-AG   BAUMR-AG   BAUMR-AG   BAUMR-AG   BAUMR-AG   BAUMR-AG   BAUMR-AG   BAUMR-AG  

BAUMR-AG   BAUMR-AG   BAUMR-AG   BAU

MR-AG   BAUMR-AG   BAUMR-AG   BAUMR-AG   BAUMR-AG   BAUMR-AG   BAUMR-AG   BAUMR-AG  

BAUMR-AG   BAUMR-AG   BAUMR-AG   BAU

MR-AG   BAUMR-AG   BAUMR-AG   BAUMR-AG   BAUMR-AG   BAUMR-AG   BAUMR-AG   BAUMR-AG  

BAUMR-AG   BAUMR-AG   BAUMR-AG   BAU

MR-AG   BAUMR-AG   BAUMR-AG   BAUMR-AG   BAUMR-AG   BAUMR-AG   BAUMR-AG   BAUMR-AG  

BAUMR-AG   BAUMR-AG   BAUMR-AG   BAU

MR-AG   BAUMR-AG   BAUMR-AG   BAUMR-AG   BAUMR-AG   BAUMR-AG   BAUMR-AG   BAUMR-AG  

BAUMR-AG   BAUMR-AG   BAUMR-AG   BAU

MR-AG   BAUMR-AG   BAUMR-AG   BAUMR-AG   BAUMR-AG   BAUMR-AG   BAUMR-AG   BAUMR-AG  

BAUMR-AG   BAUMR-AG   BAUMR-AG   BAU

MR-AG   BAUMR-AG   BAUMR-AG   BAUMR-AG   BAUMR-AG   BAUMR-AG   BAUMR-AG   BAUMR-AG  

BAUMR-AG   BAUMR-AG   BAUMR-AG   BAU

MR-AG   BAUMR-AG   BAUMR-AG   BAUMR-AG   BAUMR-AG   BAUMR-AG   BAUMR-AG   BAUMR-AG  

BAUMR-AG   BAUMR-AG   BAUMR-AG   BAU

MR-AG   BAUMR-AG   BAUMR-AG   BAUMR-AG   BAUMR-AG   BAUMR-AG   BAUMR-AG   BAUMR-AG  

BAUMR-AG   BAUMR-AG   BAUMR-AG   BAU

MR-AG   BAUMR-AG   BAUMR-AG   BAUMR-AG   BAUMR-AG   BAUMR-AG   BAUMR-AG   BAUMR-AG  

BAUMR-AG   BAUMR-AG   BAUMR-AG   BAU

MR-AG   BAUMR-AG   BAUMR-AG   BAUMR-AG   BAUMR-AG   BAUMR-AG   BAUMR-AG   BAUMR-AG  

BAUMR-AG   BAUMR-AG   BAUMR-AG   BAU

MR-AG   BAUMR-AG   BAUMR-AG   BAUMR-AG   BAUMR-AG   BAUMR-AG   BAUMR-AG   BAUMR-AG  

BAUMR-AG   BAUMR-AG   BAUMR-AG   BAU

MR-AG   BAUMR-AG   BAUMR-AG   BAUMR-AG   BAUMR-AG   BAUMR-AG   BAUMR-AG   BAUMR-AG  

BAUMR-AG   BAUMR-AG   BAUMR-AG   BAU

MR-AG   BAUMR-AG   BAUMR-AG   BAUMR-AG   BAUMR-AG   BAUMR-AG   BAUMR-AG   BAUMR-AG  

BAUMR-AG   BAUMR-AG   BAUMR-AG   BAU

MR-AG   BAUMR-AG   BAUMR-AG   BAUMR-AG   BAUMR-AG   BAUMR-AG   BAUMR-AG   BAUMR-AG  

BAUMR-AG   BAUMR-AG   BAUMR-AG   BAU

MR-AG   BAUMR-AG   BAUMR-AG   BAUMR-AG   BAUMR-AG   BAUMR-AG   BAUMR-AG   BAUMR-AG  

BAUMR-AG   BAUMR-AG   BAUMR-AG   BAU

MR-AG   BAUMR-AG   BAUMR-AG   BAUMR-AG   BAUMR-AG   BAUMR-AG   BAUMR-AG   BAUMR-AG  

BAUMR-AG   BAUMR-AG   BAUMR-AG   BAU

MR-AG   BAUMR-AG   BAUMR-AG   BAUMR-AG   BAUMR-AG   BAUMR-AG   BAUMR-AG   BAUMR-AG  

BAUMR-AG   BAUMR-AG   BAUMR-AG   BAU

MR-AG   BAUMR-AG   BAUMR-AG   BAUMR-AG   BAUMR-AG   BAUMR-AG   BAUMR-AG   BAUMR-AG  

BAUMR-AG   BAUMR-AG   BAUMR-AG   BAU

MR-AG   BAUMR-AG   BAUMR-AG   BAUMR-AG   BAUMR-AG   BAUMR-AG   BAUMR-AG   BAUMR-AG  

BAUMR-AG   BAUMR-AG   BAUMR-AG   BAU

MR-AG   BAUMR-AG   BAUMR-AG   BAUMR-AG   BAUMR-AG   BAUMR-AG   BAUMR-AG   BAUMR-AG  

BAUMR-AG   BAUMR-AG   BAUMR-AG   BAU

MR-AG   BAUMR-AG   BAUMR-AG   BAUMR-AG   BAUMR-AG   BAUMR-AG   BAUMR-AG   BAUMR-AG  

BAUMR-AG   BAUMR-AG   BAUMR-AG   BAU

MR-AG   BAUMR-AG   BAUMR-AG   BAUMR-AG   BAUMR-AG   BAUMR-AG   BAUMR-AG   BAUMR-AG  

BAUMR-AG   BAUMR-AG   BAUMR-AG   BAU

MR-AG   BAUMR-AG   BAUMR-AG   BAUMR-AG   BAUMR-AG   BAUMR-AG   BAUMR-AG   BAUMR-AG  

Summary of Contents for BMLAT-07

Page 1: ...ary 2020 READ THIS MANUAL CAREFULLY BEFORE USE FAILURE TO DO SO MAY RESULT IN INJURY PROPERTY DAMAGE AND MAY VOID WARRANTY KEEP THIS MANUAL FOR FUTURE REFERENCE Products covered by this manual may vary in appearance assembly inclusions specifications description and packaging ...

Page 2: ...ment Do not wear loose clothing or jewellery which can be caught in moving parts Keep hair and clothing away from the equipment Stay alert and use common sense when operating the equipment Do not over reach Always maintain secure footing and balance Do not use the equipment if tired or under the influence of drugs alcohol or medication This equipment is not intended for use by persons with reduced...

Page 3: ...OPERATOR PLEASE REMEMBER When using electric tools machines or equipment basic safety precautions should always be followed to reduce the risk of fire electric shock and personal injury Keep work area clean Cluttered areas invite injuries Consider work area conditions Do not use machines or power tools in damp wet or poorly lit locations Do not expose equipment to rain Keep work area well lit Do n...

Page 4: ...urn off the machine before unplugging IF YOU QUESTION THE SAFE CONDITION OF THE MACHINE DO NOT OPERATE IT Electrical Grounding Instructions This machine has a three prong plug can choose the third round prong is for the ground Plug this cord only into a three prong receptacle Do not attempt to defeat the protection the ground wire provides by cutting off the round prong Cutting off the ground will...

Page 5: ...d The product may have blades edges or mechanical devices that can cause severe crush injury to fingers limbs etc Take due care when handling and using the product Single Operator Only The product must be operated by a single person only More than one person operating the product may introduce additional hazards Use Face Protection Wear appropriate full face protection and take due care as the pro...

Page 6: ...l Shock Hazard Disconnect High voltage or high current electricity may be present or required by the product Always disconnect the product from the electrical supply before handling the product adjusting maintenance etc Power Line Electrocution Hazard High voltage high current power lines may be present Use extreme caution to avoid contact or interference with power lines Electrical shock can be f...

Page 7: ...s 13 Operation 15 Simple Turning 15 Simple Turning with Power Feed 16 Bevel Cutting 16 Screw Cutting 17 Changing Gears for Screw Cutting 18 Gear Chart for Cutting Imperial Threads 19 Gear Chart for Cutting Metric Threads 20 Maintenance 21 Before Use 21 After Use 21 Motor Brushes 21 Settings and Adjustments 22 Cross Slide Adjustments 22 Cross Slide Feed Handle 22 Compound Slide Adjustments 22 Acces...

Page 8: ...U M R A G B A U M R A G B A U M R A G B A U M R A G B A U M R A G M R A G B A U M R A G B A U M R A G B A U M R A G B A U M R A G B A U M R A G B A U M R A G B A U M R A G B A U M R A G B A U M R A G M R A G B A U M R A G B A U M R A G B A U M R A G B A U M R A G B A U M R A G B A U M R A G B A U M R A G B A U M R A G B A U M R A G A G B A U M R A G B A U M R A G B A U M R A G B A U M R A G B A U ...

Page 9: ... be used to move the tool by small amounts at right angles to the cross slide The slide may be set at an angle to the cross slide so that short tapers or bevels may be cut This is described in greater detail under Bevel Cutting A U M R A G R A G B A U M R A G A G B A U M R A G B A U M R G B A U M R A G B A U M R A G B A U M R B A U M R A G B A U M R A G B A U M R A G B A U A U M R A G B A U M R A ...

Page 10: ... A U M R A G B A U M R A G B A U M R A G B A U M R A G B A U M R A G B A U M R A G B A U M R A G B A U M R A G B A U A U M R A G B A U M R A G B A U M R A G B A U M R A G B A U M R A G B A U M R A G B A U M R A G B A U M R A G B A U M R A G M R A G B A U M R A G B A U M R A G B A U M R A G B A U M R A G B A U M R A G B A U M R A G B A U M R A G B A U M R A G B A U M R A G M R A G B A U M R A G B A...

Page 11: ...R A G B A U M R A G B A U M R A G B A U M R A G B A U M R A G B A U M R A G B A U M R A G B A U M R A G B A U M R A G B A U M R A G B A U M R A G B A U M R G B A U M R A G B A U M R A G B A U M R A G B A U M R A G B A U M R A G B A U M R A G B A U M R A G B A U M B A U M R A G B A U M R A G B A U M R A G B A U M R A G B A U M R A G B A U M R A G B A U M R A G B A U M R A G B A U A U M R A G B A U ...

Page 12: ...G B A U M R A G B A U M R A G B A U A U M R A G B A U M R A G B A U M R A G B A U M R A G B A U U M R A G B A U M R A G B A U M R A G B A U M R A G B A U M R A G M R A G B A U M R A G B A U M R A G B A U M R A G B A U M R A G B A U M R A G R A G B A U M R A G B A U M R A G B A U M R A G B A U M R A G B A U M R A G B A U M R A G B A U M R A G B A U M R A G B A U M R A G B A U M R A G B A U M R A G ...

Page 13: ...osition move the lever until the point end is in the middle pit mark in the casing A U M R A G R A G B A U M R A G A G B A U M R A G B A U M R G B A U M R A G B A U M R A G B A U M R B A U M R A G B A U M R A G B A U M R A G B A U A U M R A G B A U M R A G B A U M R A G B A U M R A G B A U U M R A G B A U M R A G B A U M R A G B A U M R A G B A U M R A G M R A G B A U M R A G B A U M R A G B A U M...

Page 14: ...R A G B A U M R A G B A U M R A G B A U M R A G B A U A U M R A G B A U M R A G B A U M R A G B A U M R A G B A U M R A G B A U M R A G B A U M R A G B A U M R A G B A U M R A G M R A G B A U M R A G B A U M R A G B A U M R A G B A U M R A G B A U M R A G B A U M R A G B A U M R A G B A U M R A G B A U M R A G M R A G B A U M R A G B A U M R A G B A U M R A G B A U M R A G B A U M R A G B A U M R ...

Page 15: ...slide ALWAYS use this procedure to align the marks This is to take up any backlash or other clearances in the gearing and slides etc Continue to turn the handle an amount equivalent to your desired depth of cut NOTE We recommend that for rough cutting you do not exceed 0 010 0 25mm as your depth of cut The setup is now complete to begin your cutting operation but before starting check the position...

Page 16: ...the compound slide which is mounted on the cross slide and set at right angles to it indicated by the zero mark on the body of the cross slide for all normal cutting operations To set the compound slide so that the cutting tool will cut a bevel first retract the slide until the two socket head screws A are revealed as shown in Fig 8 Loosen the screws sufficiently to allow the compound slide to be ...

Page 17: ...G B A U M R G B A U M R A G B A U M R A G B A U M R B A U M R A G B A U M R A G B A U M R A G B A U A U M R A G B A U M R A G B A U M R A G B A U M R A G B A U U M R A G B A U M R A G B A U M R A G B A U M R A G B A U M R A G M R A G B A U M R A G B A U M R A G B A U M R A G B A U M R A G B A U M R A G R A G B A U M R A G B A U M R A G B A U M R A G B A U M R A G B A U M R A G B A U M R A G B A U ...

Page 18: ... M R A G B A U M R A G B A U M R A G R A G B A U M R A G B A U M R A G B A U M R A G B A U M R A G B A U M R A G B A U M R A G B A U M R A G B A U M R A G B A U M R A G B A U M R A G B A U M R A G B A U M R A G B A U M R G B A U M R A G B A U M R A G B A U M R A G B A U M R A G B A U M R A G B A U M R A G B A U M R A G B A U M B A U M R A G B A U M R A G B A U M R A G B A U M R A G B A U M R A G B...

Page 19: ...A U M R A G B A U M R A G B A U M R A G B A U M R A G B A U M R A G B A U M R A G B A U M R A G B A U M R A G M R A G B A U M R A G B A U M R A G B A U M R A G B A U M R A G B A U M R A G B A U M R A G B A U M R A G B A U M R A G B A U M R A G A G B A U M R A G B A U M R A G B A U M R A G B A U M R A G B A U M R A G B A U M R A G B A U M R A G B A U M R A G B A U M R A G B G B A U M R A G B A U M ...

Page 20: ...R A G B A U M R A G B A U M R A G B A U M R A G R A G B A U M R A G B A U M R A G B A U M R A G B A U M R A G B A U M R A G B A U M R A G B A U M R A G B A U M R A G B A U M R A G B A U M R A G B A U M R A G B A U M R A G B A U M R G B A U M R A G B A U M R A G B A U M R A G B A U M R A G B A U M R A G B A U M R A G B A U M R A G B A U M B A U M R A G B A U M R A G B A U M R A G B A U M R A G B A ...

Page 21: ... G B A U M R A G B A U M R A G B A U M R A G R A G B A U M R A G B A U M R A G B A U M R A G B A U M R A G B A U M R A G B A U M R A G B A U M R A G B A U M R A G B A U M R A G B A U M R A G B A U M R A G B A U M R A G B A U M R G B A U M R A G B A U M R A G B A U M R A G B A U M R A G B A U M R A G B A U M R A G B A U M R A G B A U M B A U M R A G B A U M R A G B A U M R A G B A U M R A G B A U M...

Page 22: ...and that there is no sloppiness of action Any maladjustments will have a serious effect on the quality of your work as they will all be transferred to the tool tip it is vital that there is as little movement of the tool as possible A U M R A G R A G B A U M R A G A G B A U M R A G B A U M R G B A U M R A G B A U M R A G B A U M R B A U M R A G B A U M R A G B A U M R A G B A U A U M R A G B A U M...

Page 23: ... R A G B A U M R A G B A U M R G B A U M R A G B A U M R A G B A U M R A G B A U M R A G B A U M R A G B A U M R A G B A U M R A G B A U M B A U M R A G B A U M R A G B A U M R A G B A U M R A G B A U M R A G B A U M R A G B A U M R A G B A U M R A G B A U A U M R A G B A U M R A G B A U M R A G B A U M R A G B A U M R A G B A U M R A G B A U M R A G B A U M R A G B A U M R A G M R A G B A U M R A...

Page 24: ...G B A U M R A G B A U M R A G B A U M R A G B A U M R A G B A U M R A G B A U M R A G B A U M R A G B A U M R A G B A U M R G B A U M R A G B A U M R A G B A U M R A G B A U M R A G B A U M R A G B A U M R A G B A U M R A G B A U M B A U M R A G B A U M R A G B A U M R A G B A U M R A G B A U M R A G B A U M R A G B A U M R A G B A U M R A G B A U A U M R A G B A U M R A G B A U M R A G B A U M R ...

Page 25: ...A U M R A G B A U M R A G B A U A U M R A G B A U M R A G B A U M R A G B A U M R A G B A U M R A G B A U M R A G B A U M R A G B A U M R A G B A U M R A G M R A G B A U M R A G B A U M R A G B A U M R A G B A U M R A G B A U M R A G B A U M R A G B A U M R A G B A U M R A G B A U M R A G M R A G B A U M R A G B A U M R A G B A U M R A G B A U M R A G B A U M R A G B A U M R A G B A U M R A G B A ...

Page 26: ...A G B A U M R A G B A U M R A G B A U M R A G B A U M R A G B A U M R A G B A U M R A G M R A G B A U M R A G B A U M R A G B A U M R A G B A U M R A G B A U M R A G B A U M R A G B A U M R A G B A U M R A G B A U M R A G A G B A U M R A G B A U M R A G B A U M R A G B A U M R A G B A U M R A G B A U M R A G B A U M R A G B A U M R A G B A U M R A G B G B A U M R A G B A U M R A G B A U M R A G B ...

Page 27: ...a qualified specialist for your application before use regardless of any assurances from the retailer or its representatives This product is not intended for use where fail safe operation is required As with any product for example automobile computer toaster there is the possibility of technical issues that may require the repair or replacement of parts or the product itself If the possibility of...

Reviews: