
Manual for
BAUER RAINSTAR A1, A2
24
14.1 TESTING THE SHUT-OFF DEVICE
1.
Unlock the cart lift (21), engage the gear. Then put the cart lift again to shut-off position until hook (10)
has locked. Simultaneously turn the shaft (14) at the gear (magnetic disk with optional speedometer).
When the PTO does not turn anymore, shut-off position is reached. (Put a hand wheel on the PTO for
easier checking of the turning movement.)
2.
Put the shut-off frame (17) against the PE-pipe (last layer).
Unlock the cart lift (21). Put the shut-off console (20) via the shut-off lever to position "PE-pipe retraction".
Pull the shut-off frame (17) to shut-off position (= X mm off the reel).
Simultaneously turn the shaft (14) at the gear (magnetic disk with optional speedometer). When the PTO
does not turn anymore, shut-off position is reached. (Put a hand wheel on the PTO for easier checking of
the turning movement.)
15 SETTING OVERPRESSURE SHUT-OFF VALVE ( Option )
Pull up the rod with the ball coupling, until the arm of the ball valve snaps into place.
When adjusting the cart hook 4mm, see also adjustment of the gear shut-off under point 14, the hand lever (1)
with the nut (2)must be set to the cart lift until the ball valve is activated.
Then tighten the nut with the second nut.
Mount two other nuts (2) at the inner surface of the arm of the ball valve with a distance of 2mm and tighten
them.
1
2
3
4 mm