
“MIRAGE – 60” Rev. 2 Ver. 5 07/2013
10
11.
Push the
Single side strip (13)
between the groove of the
Guide rail (03)
and both
Stationary glasses A & B
using
wooden shims or other piece of wood.
See fig. 11 for details.
Fig
. 11
12.
Glass shelves (19)
are installed to
Stationary
glass B (20).
Mark the
Glass shelf
position on the wall.
According to the measurements in Fig. 12.1,
mark drill holes for the shelf brackets.
Drill the holes using
Ø 5/16”
drill bit and insert
the
Wall anchors (06)
.
Attach the
Shelf brackets without nut (17)
to
the wall with
Countersunk screw ST4.2×40
(16)
and attach
Shelf brackets with nut (18)
to
Stationary glass B
.
Insert the
Glass shelf
into the
Shelf brackets
and tighten the screws at the bottom of the
brackets.
Start installation with top
Glass shelf
and
repeat this step to install the bottom
Glass
shelf.
See Fig. 12 and Fig. 13 for details.
Fig
. 12
2 3
/8"
10
"
2
1
6
5
4
3
2
1
Ø 5/16”