Installation and operation
18 / 24
700118
EN
Power supply connection
• Verify if technical data of the appliance (see rating plate) correspond with the
local electric power grid specification.
• Connect the appliance to a single, properly grounded mains socket with
protective contact. Do not connect the appliance to a multi-socket.
• The power cord should be laid in a way preventing anyone from threading on it
or tripping against it.
• Prior to first use or after the relocation, the appliance should be installed and left
standing upright for at least 30 minutes, before it is connected to power supply.
• After a power failure or when the plug is removed from the socket, do not
reconnect the appliance to power supply for at least 5 minutes.
5.2
Operation
Tips for the User
• Shelves may be positioned at various heights. Arrange them adequately to the
size of beverage containers, so that the inner space is used optimally.
• Beverages or snacks should be arranged on the shelves or door shelves so that
proper distances between them allow for sufficient air circulation inside the
appliance. Insufficient distances hinder the cooling effect.
• To limit loss of cold air minimize the opening time of door during operation. Do
not open the door too frequently.
• If the appliance is switched off for a longer period of time, the door of the
refrigerator should remain open.
Preparation of the Appliance
1. Prior to first operation, clean the appliance and its equipment according to
instructions in section
6 "Cleaning"
.
2. To end with, dry the appliance and accessories thoroughly.
3. Introduce the shelves into the appliance at the selected height.
4. Fix the shelves in the door.
Summary of Contents for 700118
Page 1: ...34L 700118 ...