Installation and operation
200119
15 / 20
EN
Appliance Operation
1. Connect the machine to the power supply and switch it on.
2. Place appropriate dishes under the
taps (glass, mug).
3. Start the device with use of main
ON/OFF switch.
The green operation indicator light will
come on.
4. Start the ON/OFF pump switches.
5. Open the taps.
6. Wait for the drink to start flowing
from the tap.
7. Close the taps.
After approx. 5 min., the device is
ready to pour the mulled wine.
Fig. 4
8. Pour the drink according to needs and serve.
9. When the device is not in use, make sure that the taps are closed.
10. Switch the device off with the main switch and disconnect from the power supply
(push the OFF switch!).
Summary of Contents for 1300
Page 1: ...1300 200119 ...