background image

IP56_Installation Procedure - Telescopic Boom Gate   ©  Copyright 2019   

www.barriergroup.com.au

Operation side

Step 1: 

Mounting the post in position to suit desired opening

Step 2:

Insert Boom

Step 3:

Adjust boom length to suit

Step 4:

secure boom

4200mm

CLEAR OPENING 3875mm

(4991mm)

2000mm

2650mm

CLEAR OPENING 2325mm

2500mm

(3451mm)

Max opening

Min opening

Operation side

Step 1: 

Mounting the post in position to suit desired opening

Step 2:

Insert Boom

Step 3:

Adjust boom length to suit

Step 4:

secure boom

4200mm

CLEAR OPENING 3875mm

(4991mm)

2000mm

2650mm

CLEAR OPENING 2325mm

2500mm

(3451mm)

Reviews: