IP56_Installation Procedure - Telescopic Boom Gate © Copyright 2019
www.barriergroup.com.au
Operation side
Step 1:
Mounting the post in position to suit desired opening
Step 2:
Insert Boom
Step 3:
Adjust boom length to suit
Step 4:
secure boom
4200mm
CLEAR OPENING 3875mm
(4991mm)
2000mm
2650mm
CLEAR OPENING 2325mm
2500mm
(3451mm)
Max opening
Min opening
Operation side
Step 1:
Mounting the post in position to suit desired opening
Step 2:
Insert Boom
Step 3:
Adjust boom length to suit
Step 4:
secure boom
4200mm
CLEAR OPENING 3875mm
(4991mm)
2000mm
2650mm
CLEAR OPENING 2325mm
2500mm
(3451mm)