Lindsay Transportation Solutions Sales and Services, Inc
(888) 800-3691 [U.S. toll free] or +1 (707) 374-6800
Lindsay Transportation Solutions Sales and Services, Inc
(888) 800-3691 [U.S. toll free] or +1 (707) 374-6800
16
Step 13 – Tightening the Cables
Only tighten the cables using the nuts at the Cable Bracket end (post 7) (Figure 25).
Do not tighten the cable nuts at front of the Ground Anchor.
Tighten the cables until they are taut, i.e. they rest in the backside of the W-beam and do not
visibly sag between posts (Figure 26). There is no torque requirement for the cables.
Figure 25. Tighten cables at Cable Bracket end (post 7).
Figure 26. Tighten cables until they are taut.
Step 14 – Attach Nosing
Push nosing into place on the front of the impact head. Attach using the supplied nylon push
rivets (Figure 27).
Delineation to be attached to nosing, as per the Local Authorities requirements.
Figure 27. Attach nose using nylon push rivets.
INSTALLATION AND MAINTENANCE MANUAL