4
7.
8.
Install screen by sliding down the channels
on either side of the posts (Fig. 6) and into the
channel of the bottom rail.
Slide H-Channel in the groove from the top,
resting it on the top of the Decorative Screen
Panel. Lift H-Channel about 1/8" (to allow for
expansion and contraction), then pre-drill a hole
following same process in Step 6. Screw should
be installed directly on the small groove of the
post, connecting with the H-channel. (Fig. 7).
NOTE:
The screen will be loose in the posts and
the bottom rail. This is designed to allow
the screen to expand and contract during
heating and cooling of the day.
Fig. 6
Fig. 7
6.
Locate where to pre-drill a hole through the post
and rail (Fig. 4). Pilot holes for screws should be
located directly at the intersection of the small
groove of the post and the channels. Using
the 1/8" drill bit provided, pre-drill pilot hole as
indicated above.
Then, using the #2 square drive bit provided in
the kit, secure screw into both posts, securing
posts and rails together. (Fig. 5). Remove 3"
spacer blocks.
Screw
Screw
Fig. 5
Fig. 4
Predrill - Line
Predrill - Line
Predrill - Corner
Predrill - Corner
Predrill - Corner
Predrill - Corner
Predrill - Corner
Predrill - End
Predrill - End
Summary of Contents for DECORATIVE SCREEN PANEL FRAME KIT
Page 19: ...19 ...