
12
Check and lubricate clutch /brake /throttle /wires at weekly intervals, and visually check
for fraying as this can effect operation abilities on this machine.
Bolts and nuts may become loose due to vibration in initial period of operation. Check that
all bolts are fastened to recommended torque requirements.
3. Torque settings
Inspection of brake
2-4
Inspect whether the brake functions completely.
When need to adjust brake, according to “5 - 8 Brake lever” to adjust it.
Installing / removing basket
1-6
Before installing / removing basket, keep machine stop.
When installing basket, hang the side latches (right & left) of basket on the roller brackets.
When removing basket, raise the basket up to disengage side latches (right & left) from the
roller brackets.
Roller bracket
Latch
1-5
Crimp terminal
Plug
Normal bolt
Heat treated bolt
M6 70 Lbf
M8 156 Lbf 313 Lbf
M10 313 Lbf 625 Lbf
M16
1.5 pitch left-hand thread: 313 Lbf
Appropriate fastening torque Lbf