8
Unpacking
1.
Visually check for any physical
damage to the shipping container.
2.
Inspect the equipment surfaces that
are adjacent to any damaged area.
3.
Open the furnace door and remove
the packing material from inside the
furnace chamber.
4.
Vacuum the chamber prior to use to
remove the insulation dust due to
shipment.
5.
Retain the original packaging mate-
rial if reshipment is foreseen or
required.
Summary of Contents for FB1310M
Page 27: ...27 Wiring Diagrams FB 1400 models FB1300 models ...
Page 28: ...EXPLODED VIEW 28 ...
Page 29: ...EXPLODED VIEW 29 ...
Page 31: ...31 ...