background image

Turn to the Mounting and Utility Connections
section of this manual for mounting instruc-
tions.

Three Holder B-pure (Three Water

Treatment Cartridges)   

A common configuration built from B-pure
components is a Three-Holder System. This
system will utilize three water treatment car-
tridges in series. This will require a Dual
Holder and a single holder B-pure (D4511)
Disassemble the unit as follows:

1.

Position Dual Holder on right and sin-
gle holder on left on top of table.

2.

Remove the canisters from all units.

3.

Drive up fastener pins from the outlet
of the single holder and the inlet of
the dual holder and remove end fit-
tings. This is accomplished by gently
tapping from the bottom with a small
screwdriver and a hammer — exces-
sive force will damage the pins.

4.

Connect the two units together using
the head interconnector supplied.
Ensure that the o-ring is present in
both openings. Install and seat fasten-
er pins.

5.

Turn to the “Mounting and Utility
Connections” section of this manual
for mounting instructions.

21

M

AINTENANCE AND

S

ERVICING

Note
Refer to Figure 2 for assembly
order.

Summary of Contents for D4505

Page 1: ...System OPERATION MANUAL AND PARTS LIST SERIES 583 Model Voltage D4505 D4511 D4521 120 D4522 33 230 D4523 100 D4524 120 D4525 240 D5831 120 D5832 240 D5833 120 D5834 240 D5839 1 BARNSTEAD THERMOLYNE C...

Page 2: ...late Filters 12 Filling Procedure 13 Operation 14 Resistivity Meter Puralite 14 Maintenance and Servicing 15 Cartridge and Filter Replacement 15 System Sanitization 16 Cleaning the Resistivity Cell 17...

Page 3: ...Warnings To avoid electrical shock always 1 Use a properly grounded electrical outlet of correct voltage and current handling capacity 2 Avoid mounting B pure directly over equipment that requires el...

Page 4: ...tions are tight to avoid leakage of chemicals 4 Always depressurize chemical lines before disassembly 5 Carefully follow the manufacturer s safe ty instructions on labels of chemical containers and Ma...

Page 5: ...171 5 6 75 171 5 6 75 Height 673 26 5 591 23 25 368 14 5 Op weight kg lb 12 7 28 5 9 13 5 11 Plumbing Connections Inlet 1 2 NPTF 1 2 NPTF 1 2 NPTF Outlet 1 2 NPTF 1 2 NPTF 1 2 NPTF 1 4 NPTF 5 16 OD Ho...

Page 6: ...Directive 89 336 EEC as amended by 92 31 EEC and 93 68 EEC and per the provisions of the Low Voltage Directive 73 23 EEC as amended by 93 68 EEC The authorized representative located within the Europ...

Page 7: ...ure units come completely assembled A spare head interconnector 15853 is supplied as a loose part with the single B pure D4511 and the 1 2 size B pure D4505 and D5839 Retain this item for possible lat...

Page 8: ...d the Mix Match sec tion before mounting the system The mounting hole patterns will vary depending on the particu lar configuration that you choose The B pure system requires expendable pre treatment...

Page 9: ...s an optional extra for other B pure products See exploded view drawing for part num bers Mount the B pure unit using the following steps 1 Remove the wall bracket from the unit 9 INSTALLATION Warning...

Page 10: ...t wall bracket and secure with fas teners 5 Re secure B pure on bracket and refas ten securing screws 6 Connect feedwater service to the left side of the head assembly using adapter provided Use Teflo...

Page 11: ...the cartridge if this o ring is not in place 4 Place cartridge s in canister with the large opening down 5 Wet canister o ring before installation Install canister by depressing thumb lever and rotat...

Page 12: ...canister from head by pressing the thumb lever and rotating the ring 1 4 turn to the left 3 Lubricate the o rings on the adapters using pure water then install adapters into filters by turning the ada...

Page 13: ...nt button on top of head to remove air 4 When there is a steady flow from the outlet valve close the outlet valve 5 If using a resistivity meter plug into electrical service 6 Open the outlet valve an...

Page 14: ...ntegral cell The resistivity meter measures the specific resistance of the water on a scale of 0 1 to 18 3 megohm cm The resistivity measurement is automatically temperature compensated to 25 C regard...

Page 15: ...the inlet side of the system 2 Place a suitable container under the outlet and open the outlet valve to depressurize the system 3 Press vent button on top of B pure head 4 Place a container under the...

Page 16: ...ith soap or detergent using a sponge or clean cloth Rinse out the canister s and head s with clean water several times to remove the deter gent residues 5 Make up the following disinfecting solu tion...

Page 17: ...l Operation 15 Turn to the Operation section of this manual for filling procedure and nor mal operation Cleaning the Resistivity Cell Clean the resistivity cell as follows 1 Disconnect power to the sy...

Page 18: ...bacteria If the system has remained inactive and full of water then the system should be drained cleaned and sani tized before new cartridges are installed Mix and Match All B pure products are design...

Page 19: ...ssemblies retained by the fastener pins Fastener pins are removed by gently tapping them up with a screwdriver Set the fastener pins and other parts aside If you have a dual holder B pure it is not ne...

Page 20: ...the drawoff valve assembly from the dual holder by driving up the fastener pins 4 Remove the end fitting on the inlet and outlet of the 1 2 size filter holder Reassemble the units as follows 1 Instal...

Page 21: ...der on left on top of table 2 Remove the canisters from all units 3 Drive up fastener pins from the outlet of the single holder and the inlet of the dual holder and remove end fit tings This is accomp...

Page 22: ...t is low in pH ideal for precious metal or isotope recovery Anion N A D0760 Effective removal of anion impurities raises the pH of solutions recovers precious metal complexes High Capacity N A D0803 R...

Page 23: ...king canisters O ring missing damaged Replace or position correctly or not seated properly in the groove of canister Excessive particulate One or both filter adapters Check that the adapters are insta...

Page 24: ...24 Exploded Views Figure 2 Three holder B pure Three Water Treatment Cartridges...

Page 25: ...25 EXPLODED VIEWS Figure 3 Exploded View B pure D4511 CS550X1 HN550X1A GSX28 GSX27 15852 06440 BK583X2 FP550X1 BC583X2A FS550X2 BC583X8A PT583X1A...

Page 26: ...26 EXPLODED VIEWS Figure 4 Exploded View B pure D4505 FS550X2 CS583X1 FP550X1 BK583X2 06440 15852 GSX27 GSX28 HN550X1A BC583X8A PT583X1A...

Page 27: ...27 EXPLODED VIEWS Figure 5 Exploded View B pure D5839...

Page 28: ...XPLODED VIEWS BR550X4 BR550X2 PM582X1 05930 2 CS550X1 02273 BK582X2 2 FS550X1 HN550X1A GSX28 GSX27 06440 FP550X1A 06440 2 BC583X8A 2 PT583X1A BK583X4 BK583X4 Figure 6 Exploded View for Dual Holder B p...

Page 29: ...e Consumables List The only consumables used in the B pure products are user selected The following chart is provided for the user as a means of recording the cartridges part numbers catalog num bers...

Page 30: ...tock of those parts listed under General Maintenance and Safety Stock In the event of component failure the safety stock can be drawn upon by the user or Barnstead technicians thereby avoiding unneces...

Page 31: ...m whom you purchased this unit or can be obtained promptly from the factory When service or replacement parts are needed we ask that you check first with your dealer If the dealer cannot handle your r...

Page 32: ...ained from an authorized Barnstead Thermolyne dealer or Barnstead Thermolyne at its own discre tion Heating elements however because of their susceptibility to overheating and contam ination must be r...

Reviews: