
14
Tap water/In-House Treated Water - Fig. 9
(Must have the optional double solenoid valves:
Catalog No. 440236)
1.
Thread the solenoid valves (“in” side towards
shut-off) onto the customer supplied shut-
offs.
2.
Install 1/4" O.D. tubing and the supplied
fitting to the “out” side of the solenoid on the
tap water.
3.
Connect the fitting and 3/8" I.D. vinyl tubing
from the double solenoid valve kit to the “out”
side of the treated water supply.
4.
Locate boiler fill tube (Q). Connect 3/8" I.D.
tubing from the treated water supply solenoid
to the end of the boiler fill tube. Route as
shown and install clip (T) to support.
5.
Route 1/2" I.D. vinyl tubing to an
atmospherically vented drain.
6.
Plug the solenoid valve power cord (not
shown) into the receptacle in the control
box (O).
Installation
Location of Unit
Space allotment for a still should include a 6"
clearance at the sides and top to allow for cover
removal and air circulation.
Do not mount your MEGA-
PURE
®
6A Water Still directly
over equipment that requires
electrical service. Routine
maintenance of this unit may
involve water spillage and
subsequent electrical shock
hazard if improperly located.
Warning
Figure 9
Tap Water/In-House Treated Water
Installation