![barkman oasis Assembly Operation Maintenance Manual Download Page 9](http://html1.mh-extra.com/html/barkman/oasis/oasis_assembly-operation-maintenance-manual_3871771009.webp)
9
3. Repeat the patterns from Steps 1&2
of Section B to a height of 5 layers
above the accent band.
4. Lay out the sixth layer of the wall
surround as indicated in the diagram.
8 x 12
(9)
5. Place the arch into the seventh
layer as indicated in the diagram.
Glue the arch down where it
contacts the quarry stone below
using the included landscape glue.
IMPORTANT:
Be sure to hold the arch
in place until the next layer of quarry
stone is set atop of it.